Opportunity

Ames Ionwave #2027-053 Addendum 1

Engineering design for replacement of three Ames power-plant load centers

Posted

November 05, 2026

Respond By

December 10, 2026

Identifier

2027-053 Addendum 1

NAICS

541330

The City of Ames Electric Services Department is seeking an engineering consultant to design replacement of three load centers at the Ames Municipal Power Plant. - Buyer: City of Ames, Iowa — Electric Services Department; Purchasing Division is identified in the solicitation materials. - Requested work: Engineering evaluation, field verification, calculations, design, bidding support, construction-phase assistance, an arc-flash study, and closeout for Load Centers LC5, LC6, and LC7. Replacement of their supply conductors or busway is included. - Technical scope: Design for existing three-phase 480 VAC loads, modern breakers with automatic motorized racking, local and remote controls, conduit and wiring, and integration with plant monitoring and control systems. Consider spare cubicles and added capacity for future plant needs. - Named OEMs and systems: Federal Pacific breakers are identified as obsolete in the existing equipment. Emerson Ovation DCS and OSI Monarch SCADA are existing or planned plant systems; a selection of SEL products is desired. These names are design references, not selected suppliers for this engineering contract. - Notable requirements: Plan the replacement sequence to limit outages and identify alternate power or rented generators if needed. Plans and specifications must be stamped by an Iowa-licensed professional engineer. Construction observation is expected primarily from City staff, with consultant milestone inspections. - Deliverables: Iowa public-bidding plans and specifications, a probable construction cost estimate, a project schedule, bidder-question and bid-review assistance, construction document reviews, and completion certification, as-builts, and updated plant drawings. - Commercial information: No equipment part numbers, equipment purchase quantities, named engineering bidder, or contract value are provided. Consultant insurance and indemnification requirements are also included.

Description

The City of Ames seeks proposals from qualified firms to provide engineering services for replacing three load centers at the City of Ames Power Plant in Ames, Iowa. Services include evaluation and design, planning to minimize outages, preparation of plans and specifications for public bidding, bidding-phase assistance, construction-phase services, an arc flash study, and project close-out documentation. The designs will address modern breakers, associated controls and monitoring, and integration with plant electrical systems. Proposals are due December 10, 2026, and questions are due November 18, 2026.

View original listing