Opportunity

SAM #FD206027-00036

Depot-level overhaul of nine C-5 fire suppression system components

Buyer

Air Force Security Forces Center (AFSFC)

Posted

November 18, 2026

Respond By

November 27, 2026

Identifier

FD206027-00036

NAICS

336413

The U.S. Air Force is seeking depot-level overhaul of nine C-5 Galaxy fire suppression system components. - Government buyer: Department of the Air Force / U.S. Air Force, through Air Force Materiel Command and Air Force Sustainment Center, office FA8538 AFSC PZAAB; WR-ALC AFLCMC/WLSEAB, C-5 Engineering, is referenced for engineering and tooling approval. - OEMs and vendors: No OEMs or vendors are named. Work must follow applicable Air Force technical manuals and OEM acceptance test procedures. - Components requested: Quantities are not specified. - 2-inch zone fire valve — P/N 7720011-106; NSN 4810010033512. - Isolation valve — P/N 7720012-105; NSN 4810010033513. - Shutoff valve — P/N 7720013-107; NSN 4810010033514. - Zone fire valve (listed as 1-inch in the attachment) — P/N 7720015-107; NSN 4810010046559. - Primary pressure relief and overboard relief valve — P/N 7720125-101; NSN 4820001851031. - Pressure limiter valve — P/N 7720142-101; NSN 4820001851033. - Secondary pressure regulator — P/N 7720224-101; NSN 4820001851037. - Fill coupling receptacle — P/N 7720017-102; NSN 4820001867007. - Backpressure relief valve — P/N 7720119-102; NSN 4820002700682. - Work scope: Teardown, inspection, evaluation, functional testing, repair and overhaul of Government-furnished unserviceable components to return them to serviceable condition. Contractor provides labor, materials, parts, tooling, equipment and facilities; related logistics and data collection are also included. - Notable requirements: Repair work must comply with the applicable technical manuals and OEM acceptance test procedures. The requirement includes a surge option of up to 40%, CAV-AF reporting, delivery performance targets of 95% on time and the remaining 5% no more than seven days late, and 30-day delivery for qualifying SURGE or MICAP needs.

Description

C-5 Fire Suppression System

This requirement is for depot-level repair for the nine competitive C-5 items listed below. The depot-level repair to be performed includes tear-down, evaluation, repair, testing, component procurement, packaging, handling, storage, transportation, as well as data collection. These services will provide assets to support all the C-5 aircraft until expected retirement of 2040. The assets provided by these services will be used to reduce current back orders and meet quarterly demand rates in support of Air Force sorties and aircraft Programmed Depot Maintenance (PDM).

The best estimated quantities (BEQs) with estimated cost.

Noun National                                               Stock Number (NSN)                          Part Number

2 - Inch Zone Fire Valve                                4810010033512                                   7720011-106

Isolation Valve                                               4810010033513                                   7720012-105

Shutoff Valve                                                 4810010033514                                    7720013-107

1 ¼ - Inch Zone Fire Valve                           4810010046559                                      7720015-107

Primary Pressure Relief & Overboard Relief Valve  4820001851031                          7720125-101

Pressure Limiter Valve                                 4820001851033                                       7720142-101

Secondary Pressure Regulator                   4820001851037                                        7720224-101

Fill Coupling Receptacle                             4820001867007                                        7720017-102

Backpressure Relief Valve                          4820002700682                                         7720119-102

The projected period of contract performance for this requirement is five years. Period of performance is comprised of a basic year with 4 one-year ordering periods.

Delivery of assets - Repaired assets shall be delivered in accordance with the schedule, as defined by the contract/order. Assets shall be delivered 95% of the time with the remaining 5% being delivered no more than seven (7) calendar days late. If delivery slips more than seven (7) calendar days from contract delivery schedule, the Contractor shall notify the contracting officer to negotiate a revised delivery date. Delivery of assets to fulfill a SURGE or MICAP requirement shall be thirty (30) calendar days after contractor receives notification of a SURGE or MICAP requirement if assets are already on hand at the contractor's facility. If no assets are on hand at the time of notification, delivery shall be thirty (30) calendar days after receipt of asset(s).

Items included in this effort are military unique and the services do not meet the definitions of FAR Part 2 in terms of commercial items or non-developmental items which can be acquired in the commercial market sector using streamlined acquisition procedures under FAR Part 12.

THIS IS NOT AN AWARD

All replies are due by November 27,2026.

View original listing