Opportunity
Utah Public Procurement Place U3P #MP27009
Architectural design for Bridgerland Technical College automation and robotics renovation
Posted
November 17, 2026
Respond By
December 10, 2026
Identifier
MP27009
NAICS
541310, 541330
Utah DFCM and Bridgerland Technical College seek design services to renovate the college’s Main Building into an automation, controls, and robotics training facility. - Government buyer: State of Utah, Division of Facilities Construction and Management (DFCM), in partnership with Bridgerland Technical College (BTECH); Logan campus. - Requested service: Professional architectural design for approximately 11,720 square feet of renovation and adaptive reuse. Design covers flexible labs, robotics and control systems instruction, a danger lab, teaching stations, offices, storage, and related building systems. - Equipment and named OEMs: FANUC robot arms (7 total), ABB robot arms with controllers (6), and MiR robot trainers (2). The program also identifies Skill Boss and capstone trainers, 3D printing stations, a wide-format inkjet printer, and a laser cutter; most equipment is owner-furnished. - Notable design requirements: Plan for equipment utilities and laser-cutter fume exhaust; lab safety; adaptable hands-on instructional spaces; and renovation of existing building infrastructure. The project involves an occupied facility and must address structural conditions, fire separation and code compliance, aging electrical systems, and acoustic isolation. - Other equipment and furnishings are itemized below. No part numbers are provided. - Cost information: Construction estimates differ across the documents, at approximately $2.34 million and $4.12 million; neither is stated as the design-services contract value. - Schedule: The programming document estimates 10 months for design, 3 months for permitting and bidding, and 18 months for construction. The design-services contract start and duration are not specified.
Description
The State of Utah Division of Facilities Construction and Management (DFCM) and Bridgerland Technical College seek proposals for professional design services to remodel approximately 11,720 gross square feet in the Main Building at the college’s Logan campus. The renovated space will support Automation Technology and Control Systems & Robotics, including instructional labs, a robotics lab, a specialized danger lab, faculty support areas, and related MEP infrastructure. The stated construction cost estimate is $2,337,000, and the project delivery method is Design/Bid/Build. A mandatory meeting is scheduled for November 24, 2026; proposals are due December 10, 2026.