Opportunity

New York State Contract Reporter #2140952

Medgar Evers College 3-Season Pavilion and Courtyard Construction

Posted

November 18, 2026

Respond By

January 06, 2027

Identifier

2140952

NAICS

236220, 541320

DASNY is seeking qualified firms for the Medgar Evers College 3-Season Pavilion and courtyard improvements in Brooklyn. - Government buyer: Dormitory Authority of the State of New York (DASNY), Construction / Construction Contracts, for The City University of New York (CUNY), Medgar Evers College. - Opportunity: Construction of a pavilion and related improvements at the Bedford Avenue Building, including a steel-framed canopy with a 30-mil ETFE membrane, new foundations, courtyard reconstruction, accessible concrete ramps and platform, landscaping, drainage, irrigation, lighting, and illuminated handrails. - Key quantities and specifications: Replace three wood ramps, one raised wood platform, and six exterior light poles; plant 5 Snow Queen Himalayan Birch trees, 1,294 Kelsey's Dwarf Red-Osier Dogwood shrubs, 758 Big Blue Lilyturf, and 473 Sweet Box plants. Remove approximately 410 cubic yards of contaminated, non-hazardous soil, 10 presumed PCB-containing ballasts, and 10 metal-halide bulbs. ETFE canopy edge Keder track capacity is specified at 400 lbs/ft. - Named OEMs and product manufacturers: Watts (model 009, 1½-inch irrigation backflow preventer); Cisco (3600i wireless access point reference); Wagner Railings (illuminated handrails, or approved equal); and Landscape Forms (Arne Area Light reference, or approved equal). No manufacturer is specified for the ETFE membrane or other major structural components. - Project consultants named in the reference information: ikon.5 architects; LERA Consulting Structural Engineers; Dominick R. Pilla Associates; LiRo Engineers/LiRo Group; SWA/Balsley; A&J Consulting Engineering Services; JZN Engineering; S+S Lighting Design; and Langan. These are identified as consultants, not product manufacturers. - Notable requirements: Accessible design; coordination to limit disruption on the occupied campus; NYC Parks tree-protection and permitting requirements; proper hazardous and universal waste handling; and engineering-service providers must hold applicable New York State authorization. - Eligibility and participation: The EOI is limited to qualifying New York State Minority- and Women-Owned Business Concerns; minority firms must be certified by Empire State Development. Anticipated participation goals are 18% MBE, 12% WBE, 6% SDVOB, and 45% minority and women workforce. The successful contractor must execute the Project Labor Agreement, with subcontractors at every tier signing a Letter of Assent. - Estimated construction cost: $7,713,060–$8,524,961. This notice is for expressions of interest and shortlisting before a subsequent construction bid; the reference drawings and specifications are not final bid documents.

Description

This opportunity is for expressions of interest only for construction of a 3-season pavilion at CUNY Medgar Evers College’s Bedford Avenue Building. Work primarily includes installing an ETFE fabric structure in the courtyard, replacing three wood ramps and a raised platform with concrete, replacing handrails with illuminated handrails, and replacing six exterior light poles. Qualified firms will be shortlisted and invited to bid; DASNY will hold the construction contract. The estimated construction cost is $7,713,060–$8,524,961, and EOI packages are limited to eligible Minority- and Women-Owned Business Concerns under the stated set-aside program.

View original listing