Opportunity

E-Rate #270004956

Mattawan Consolidated School campus connectivity and fiber network solutions

Posted

November 17, 2026

Respond By

December 15, 2026

Identifier

270004956

NAICS

517311

Mattawan Consolidated School is seeking E-rate Category 1 connectivity to link its Mattawan Data Center with three campus buildings in Mattawan, Michigan. - Government buyer: Mattawan Consolidated School; agency, sub-agency, and office details are not specified. - OEMs and vendors: No manufacturers, OEMs, resellers, or prospective service providers are named. No product part numbers are provided. - Requested products and services: - 3 units of Category 1 network equipment; equipment to activate a self-provisioned network may not be needed if that option is selected. - 3 standalone data transmission services, from 500 Mbps to 10 Gbps. - 12 leased dark-fiber strands. - 3 leased lit-fiber services, from 500 Mbps to 10 Gbps. - Self-provisioned, applicant-owned and operated network; the RFP describes a 12-strand fiber network connecting the three campus buildings. - 3 services over third-party networks, from 10 Gbps to 50 Gbps. - Notable requirements: Installation and initial configuration are requested. Preferred service levels include 99.999% circuit uptime, no more than 0.25% packet loss, latency of 25 ms, jitter of 10 ms, no capacity throttling, and outage repair within four hours. Fiber work is expected to be turnkey, with engineering, permits, materials, installation, project management, testing, restoration, documentation, and warranty. Technical provisions include single-mode fiber, fusion splicing, plenum-rated indoor cable, burial-grade outdoor cable, and preferred SC terminations; relevant personnel qualifications include BICSI or FOA credentials. Firm fixed-price proposals are requested, with non-eligible items identified separately. Implementation depends on E-rate funding approval, and the district may select multiple providers.

Description

Mattawan Consolidated School is seeking Category 1 data transmission and internet access services for its 2027 E-rate requirements. The RFP considers standalone data transmission, leased dark or lit fiber, self-provisioned networks, and services over third-party networks, connecting buildings on the Mattawan campus. The listed standalone service requests bandwidth from 500 Mbps to 10 Gbps for three sites; additional solution types and project requirements are detailed in the RFP. The source lists a response deadline of December 15, 2026, while the attached RFP states bids are due December 29, 2026.

View original listing