Opportunity
SAM #FA460826QS053
Flag Lake Gate Valve Frame Replacement and Operational Testing
Buyer
Fa4608 2 Cons Lgc
Posted
November 17, 2026
Respond By
November 27, 2026
Identifier
FA460826QS053
NAICS
811310
The U.S. Air Force is seeking replacement and operational testing of the Flag Lake gate valve frame at Barksdale Air Force Base. - Government buyer: Department of the Air Force, Air Force Global Strike Command; FA4608 2 CONS LGC; Natural Resources Office, Barksdale Air Force Base, Louisiana. - Requested service: Replace the existing corroded frame with two vertical rails and one horizontal brace. The Government provides the replacement frame components; the work includes fitting and installing them with the connecting hardware. - Existing equipment: Temporarily remove and reinstall the electric motor-driven actuator and retained top headrail; field-drill and align holes; and reconnect the assembly to the concrete headwall to the original gate manufacturer's specifications. - Testing and completion: Demonstrate unobstructed travel to fully open and properly sealed fully closed positions. Remove demolished materials for lawful off-base disposal and clean up the site; Government acceptance requires a successful operational check. - OEMs and vendors: No OEM or vendor is identified by name. The original gate manufacturer is referenced but not named. - Quantity and part numbers: One replacement service; no part numbers are provided.
Description
The purpose of this requirement is to replace two (2) rusted vertical frame pieces and one (1) horizontal brace of the original gate valve assembly. Work requires temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications. Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026.