Opportunity

Wisconsin Vendornet Platform #2625

Kenosha County Kemper Center Shoreline Revetment Reconstruction

Posted

November 17, 2026

Respond By

December 29, 2026

Identifier

2625

NAICS

237990

Kenosha County is seeking a contractor to reconstruct and maintain shoreline protections at the Kemper Center in Wisconsin. - Buyer: Kenosha County, through the Purchasing Division and Parks Department. - Scope: Rebuild shoreline revetment across Reaches A–D, raise the crest, construct the specified 1.5H:1V slope, and install toe protection below the lakebed. Work also includes storm sewer improvements, site preparation, erosion controls, temporary access and staging, and site restoration. - Stone and fabric: Base bid requires imported quartzite; an alternate offers granite instead. Bid quantities include 4,810 tons of bedding stone, 11,770 tons of filter stone, 12,455 tons of armor stone, 17,345 tons of existing granite armor stone to salvage, and 4,000 square yards of geotextile. The salvaged granite is also to be placed; the bid schedule lists 17,345 tons for that placement. - Other materials: Specifications include fill, topsoil, seed, mulch, fertilizer, silt fence, erosion mat, and construction fencing. Named tackifier examples are Curasol, Terra Tack, and Fibrex Spray Sod. - Key requirements: Stone must meet specified gradation and placement tolerances; the contractor must provide quarry quality controls, stone testing, test sections, and construction and verification surveys. Geotextile joints require at least 18-inch overlaps. Salvaged limestone and concrete detritus are to be crushed, relocated, and regraded. - OEMs/vendors: No stone or equipment OEM, supplier, or bidding vendor is identified. Curasol, Terra Tack, and Fibrex Spray Sod are named as tackifier examples, not identified suppliers. - Performance: Work begins after award and continues through project completion; completion is expected in 2027. No option years or annual subscription are indicated.

Description

The County of Kenosha is requesting bids to establish a contract for shoreline maintenance at the Kemper Center in Kenosha, Wisconsin. Work includes reconstructing the existing Kemper and Anderson Center revetment and an adjacent stone splash apron, raising the revetment crest, and rebuilding the slope face to 1.5H:1V. Toe protection will use armor, filter, and bedding layers below the current lakebed elevation. Salvaged granite and imported quartzite or granite will be used, and existing limestone and concrete detritus will be salvaged for reuse as underlayer materials.

View original listing