Opportunity
Georgia Procurement Registry #PE-66750-NONST-2027-000000030
Duluth City Hall 15-ton AHU replacement and open-source BAS/DDC upgrade
Posted
November 17, 2026
Respond By
January 27, 2027
Identifier
PE-66750-NONST-2027-000000030
NAICS
238220
The City of Duluth is seeking a basement air-handling unit replacement and building-controls upgrade at Duluth City Hall. - Government buyer: City of Duluth, Georgia; City Hall, Duluth, Gwinnett County. - OEM named: Carrier is identified as the manufacturer of the existing DDC/Carrier Control Network; no manufacturer or vendor is specified for the new equipment or controls. - Products requested: - One new 15-ton basement air-handling unit (AHU), with VAV controls, dehumidification, an economizer with powered exhaust, and connections to existing electrical and low-voltage controls. - One open-source building automation system (BAS) and direct digital control (DDC) system to replace the existing Carrier controls and serve 5 air-handling/rooftop units, 57 associated VAV units, and 1 exhaust fan. - Services requested: Remove and replace the basement AHU; analyze existing equipment and operating sequences; install and integrate the new controls; and configure the system front end to provide equipment status, operating mode, setpoints, airflow, temperatures, occupancy, and alarms. - Notable technical requirements: The controls must provide the specified BACnet and UPC interfaces for rooftop and terminal air units, a BACnet interface for the basement AHU, and start/stop control for the roof exhaust fan. Existing functionality must be retained, and a complete sequence of operation must be submitted for approval before demolition.
Description
The City of Duluth is seeking proposals to replace the basement air handling unit at Duluth City Hall with a new 15-ton unit, including VAV controls, dehumidification, an economizer with powered exhaust, and connections to existing electrical and low-voltage controls. The project also requires replacing the obsolete Carrier DDC control system with a new open-source building automation system. The controls upgrade covers five air handling or rooftop units, 57 associated VAV units, and one exhaust fan, with specified equipment integrated into the new system. Sealed proposals are due January 27, 2027, at 11:00 a.m. ET; the source also states that attendance at a mandatory pre-bid conference on December 10, 2026, is required.