Georgia Procurement Registry #PE-66397-NONST-2027-000000019
Sylvania overhead conductor, pole, and distribution hardware replacement
Posted
November 17, 2026
Respond By
January 13, 2027
Identifier
PE-66397-NONST-2027-000000019
NAICS
237130, 238210
The City of Sylvania, Georgia, is seeking a contractor to replace overhead electrical distribution lines and poles and upgrade related system hardware. - Government buyer: City of Sylvania, Georgia; local government in Screven County. - Requested work: Replace approximately 3.9 miles of overhead copper conductor with 1 AWG aluminum wire, replace approximately 95 failing distribution poles, and upgrade distribution hardware as needed. - Associated hardware may include crossarms, insulators, connectors, and grounding components. - The City will furnish project materials; the contractor will provide labor, equipment, installation, removal, and disposal. - Services: Transfer and reconnect conductors and equipment; coordinate outages; maintain service continuity to the extent possible; obtain permits as needed; test and commission the completed system; and provide as-built, testing, and warranty documentation. - OEMs and vendors: No OEMs, manufacturers, or vendors are named in the provided information. - Notable requirements: Relevant electrical distribution experience, Georgia licensing, at least three comparable-project references, a bid bond of at least 10% of the bid, and 100% performance and payment bonds. Davis-Bacon and Build America, Buy America requirements apply if applicable federal funding is used.
Description
The City of Sylvania is soliciting sealed bids for replacement of approximately 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire and approximately 95 failing electrical distribution poles, along with related distribution hardware upgrades. The contractor will provide labor, equipment, installation, removal, testing, commissioning, and related services to complete the work. Work includes electrical integration, coordination of outages, permitting as needed, and project closeout documentation. The City will furnish project materials; the estimated overall duration is approximately 14 months.