Opportunity
Sarpy County Ionwave #2027-460 Addendum 1
Bridge #15 rehabilitation and roadway reconstruction on 36th Street over Big Papio Creek
Posted
October 30, 2026
Respond By
November 20, 2026
Identifier
2027-460 Addendum 1
NAICS
237310
Sarpy County is seeking a construction contractor to rehabilitate Bridge #15 on 36th Street over Big Papio Creek in Nebraska. - Buyer: Sarpy County, Nebraska — Public Works Department; Sarpy County Purchasing. - Project: Bridge #15 Rehabilitation, Project C-77(24-18), including bridge and approach repairs, roadway reconstruction, median work, guardrail replacement, and traffic control. - Expansion-joint OEMs: D.S. Brown Co. (SSPA L2-400) and Watson Bowman (SE-300) are referenced in the plans as manufacturers; no vendor has been awarded the work. - Other named plan holders/vendors: General Excavating; High Plains Structural Group; JJK Construction, LLC; JMN Construction LLC; Lobato Construction, LLC; M.E. Collins Contracting Co., Inc.; Master Builders of Iowa; mcgill restoration; Nemaha Sports Construction; Terry Hughes Tree Service; and Vrana Civil, Inc. Their plan-holder status does not indicate an award. - Major bid quantities: 379 SY pavement removal; 351 SY of 9-inch concrete pavement; 248 LF median curb; 150 LF guardrail removal and 150 LF W-beam guardrail; 107.5 LF strip-seal expansion joint; 745 LF each of concrete barrier installation and relocation; 12 CY bridge concrete; 2,888 LB epoxy-coated reinforcing steel; and 34,146 LB approach reinforcing steel. - Additional work: 98 SY concrete median surfacing removal and replacement, 126 SY temporary surfacing, approach reconstruction, abutment excavation, granular backfill, equipment rentals (20 hours each for a loader, dump truck, skid loader, and vacuum truck), and traffic control. - Pavement markings: 380 LF yellow paint and 380 LF white paint, conforming to Nebraska Department of Transportation highway specifications. - Optional alternate: 405 SY bridge and culvert netting and 174.7 SY shotcrete bridge-deck repair, including bird-nest removal and netting when applicable. - Notable requirements: Follow project plans and applicable Nebraska DOT specifications. Construction is phased with southbound 36th Street closed and northbound traffic maintained. The contract provides 75 calendar days for base work, with an additional 15 days if the optional alternate is awarded; the work period is subject to the stated construction restrictions.
Description
Sarpy County is seeking a qualified contractor to rehabilitate Bridge #15 on 36th Street over the Big Papio Creek. The scope includes expansion joint replacement or improvement, approach roadway improvement, and traffic control; deck edge shotcrete repair is an additional alternate. The project is a rebid of 2026-352 and includes an additional alternate for work. Addendum 1 adds permanent pavement marking items and an additional plan set.