Opportunity
Virginia's eProcurement Marketplace #IFB-131824 (IFB 131824)
Ruthville Wastewater Treatment Plant Replacement and Collection-System Upgrades
Posted
November 17, 2026
Respond By
December 17, 2026
Identifier
IFB-131824 (IFB 131824)
NAICS
237110, 221320, 237990
Charles City County is seeking bids to replace the Ruthville wastewater treatment plant and upgrade its collection system. - Government buyer: Charles City County, Virginia; no sub-agency or purchasing office is identified. - Named OEM: Fluidyne — the owner-furnished Integrated Surge Anoxic Mix (ISAM) treatment system. No other vendors or OEMs are named. - Requested products and facilities: - Two low-pressure grinder pump stations with associated piping and equipment. - A 2-inch force main and one buried 10,000-gallon flow equalization tank. - One Fluidyne ISAM treatment system, installed on a cast-in-place concrete pad, with an elevated walkway around the treatment tank. - One chlorine contact tank with chlorination and dechlorination tablet-feed systems. - One 10-by-14-foot prefabricated building to house electrical and control panels and the alkalinity chemical-feed system. - Construction services: Replace the treatment plant and install collection-system upgrades. Keep the existing plant operating during construction; after startup, testing, and owner acceptance of the new facilities, demolish and abandon designated portions of the existing plant. - Notable requirement: The new facilities will be built adjacent to the operating plant, so construction sequencing must maintain existing operations.
Description
The project replaces the existing wastewater treatment plant serving the Ruthville Service Area of Charles City County and upgrades the collection system. Work includes two low-pressure grinder pump stations, piping and a force main, a buried 10,000-gallon flow equalization tank, an Owner-Furnished Fluidyne ISAM treatment system, and associated treatment, chemical-feed, electrical, and control facilities. The existing plant must remain operational during construction; designated portions will be demolished or abandoned after startup, testing, and Owner acceptance of the new facilities. Bidders should review the construction sequencing requirements in the Contract Drawings before submitting bids.