Opportunity

Massport #P26-3636-C9A

Massachusetts DCR Project Shade: Park Canopies and Site Improvements

Posted

November 17, 2026

Respond By

December 17, 2026

Identifier

P26-3636-C9A

NAICS

236220, 238990, 238110, 561730

Massachusetts DCR is soliciting construction bids for shade canopies and related improvements at Quinsigamond State Park–Lake Park. - Government buyer: Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Department of Conservation and Recreation (DCR). The project is identified as being in Worcester; one plans attachment identifies Bolton, so the location should be confirmed. - Project: Project Shade – Lake Park, contract P26-3636-C9A. Estimated project cost is $137,000. - Shade structures and OEM: Shade Systems is the named basis-of-design manufacturer. The plans specify one 10-by-10-foot Shade Kite and two approximately 10-by-30-foot Shade Walk canopies over existing bleachers. Another project summary describes one four-post canopy and two cantilever shelters; the attachment descriptions differ, so the final scope should be verified. - Fabric must block at least 90% of harmful UV rays. Colors require owner coordination or approval, and canopies must allow tool-free seasonal removal and reinstallation. Approved alternatives require manufacturer documentation and calculations stamped by a Massachusetts-licensed engineer. - Other requested items: Accessible paving and paths, concrete and asphalt pads or footings, an asphalt walkway, two ADA-compliant picnic tables, and tree planting. The plans list eight trees by species; the specifications separately describe eight mature trees, while the plans provide a different species and planting schedule. - Performance and warranty: Complete construction within 135 calendar days after notice to proceed. The specifications include a one-year general warranty and at least one year of tree establishment and plant warranties. - Workforce and site requirements: The attached executive order emphasizes apprenticeship and equitable workforce participation, workforce and apprenticeship data reporting, and safe, harassment-free worksites. The solicitation summary lists workforce utilization goals of 15.3% for minority workers and 6.9% for women. It reports 0% MBE/WBE/VOBE participation, while an attached supplier-diversity document lists different participation goals; bidders should confirm the governing requirements.

Description

The project involves installing two fabric shade canopies adjacent to the Lake Park athletic field: one over existing spectator bleachers on the east side and another on the south side. Work also includes accessible paving and paths, site furnishings, and native canopy trees. The estimated project cost is $137,000, and the work is to be completed within 135 calendar days of notice to proceed. Bids are restricted to invited vendors, must be submitted through DCR’s E-Bid room, and require MassDOT Highway Division prequalification in Recreational Facilities.

View original listing