Opportunity

West Haven Civicplus #2027-15

West Haven WPCF aeration air control system replacement and upgrade

Posted

November 16, 2026

Respond By

January 05, 2027

Identifier

2027-15

NAICS

238210, 541512, 237110

The City of West Haven is seeking a contractor to replace and upgrade the aeration air control system at its Water Pollution Control Facility. - Buyer: City of West Haven, Water Pollution Control Facility (WPCF). - Core equipment: 18 three-inch and 18 eight-inch resilient-seated butterfly air control valves with modulating electric actuators; 36 thermal mass insertion airflow meters; and one main air header pressure transmitter. - Named OEMs and equipment: Bray valves, Rotork IQT actuators, Kurz 410FTB airflow meters, APG-Neuros blower controls and Advanced Aeration Control software, and an Allen-Bradley CompactLogix PLC with I/O modules. Approved equals are permitted for specified equipment, subject to system compatibility. - Control upgrade: One industrial computer, updated control software, PID backup control, and dissolved-oxygen-based control configuration. The upgrade includes a first-year Aeration Control Service Plan subscription. - Services and vendor: The contractor provides demolition, engineering, electrical work, programming, installation, integration, testing, commissioning, training, documentation, and warranty support. Knapp Engineering, the City's existing SCADA integrator, is identified for SCADA integration. - Required spares: One each of a three-inch valve and actuator, an eight-inch valve and actuator, an airflow meter, and a pressure transmitter. - Notable requirements: Integrate with existing SCADA and dissolved oxygen instrumentation; provide a 12-month parts-and-labor warranty from City acceptance; and complete the work within 120 calendar days after notice to proceed or by the required completion milestone, whichever is later.

Description

The City of West Haven is soliciting proposals to replace and upgrade the aeration air control system at its Water Pollution Control Facility. Work includes removing existing equipment and installing 36 butterfly air control valves with electric actuators, 36 airflow meters, a header pressure transmitter, and upgrades to the blower master control panel. The project also includes electrical work, SCADA integration, testing and commissioning, operator training, spare parts, and warranty services. Proposals are due January 5, 2027, at 11:00 AM; a mandatory site walkthrough is scheduled for November 23, 2026, at 9:00 AM.

View original listing