Opportunity
CanadaBuys #NRCan-5000098403
NRCan piping installation and asbestos-abatement services in Calgary
Posted
November 17, 2026
Respond By
December 15, 2026
Identifier
NRCan-5000098403
NAICS
238220, 562910, 541380
Natural Resources Canada is seeking plumbing and asbestos-abatement services at its Geological Survey of Canada facility in Calgary. - Buyer: Natural Resources Canada (NRCan), Finance and Procurement Management Branch; work is for the Geological Survey of Canada in Calgary. - Scope: Install, modify, replace, test, and commission laboratory wastewater, storm-drain, and sanitary sewer piping; remove asbestos-containing materials; conduct air-fibre monitoring; and restore affected areas. - Priced service entries: Laboratory wastewater piping, 8–16 in. and 2–7 in. (10 linear feet each); storm-drain piping, 8–16 in. and 4–7 in. (10 linear feet each); sanitary sewer piping, 4–8 in. (10 linear feet); corresponding asbestos removal for each listed size (10 linear feet per entry); and asbestos air monitoring (1 location). These are estimated quantities, listed separately by work-hour category and contract period. - Notable requirements: Coordinate work to minimize disruption. Asbestos removal and associated piping installation are scheduled for weekends, with systems restored and operational before Monday. Air monitoring must be performed by a qualified third-party consultant. Security, licensing, safety, and technical requirements apply. - OEMs and vendors: No manufacturers, OEMs, or commercial vendors are named in the materials. - Term: Initial period from contract award through the end of the initial contract term, with up to three additional one-year options.
Description
Natural Resources Canada is seeking a contractor to install, modify, replace, test, and commission wastewater, drainage, and sewerage piping at the Geological Survey of Canada in Calgary. Work includes new roof drains, sewerage and chemical-resistant laboratory piping, site preparation, asbestos-containing material abatement and disposal, and connection to existing infrastructure. The contractor must coordinate with facility management, minimize disruption, document work and testing, and restore affected surfaces. The solicitation includes industrial security requirements and mandatory site visit provisions.