Opportunity

Nacogdoches County Civicplus #27-111

Construction and equipment for Nacogdoches Central Fire Station No. 1

Posted

November 15, 2026

Respond By

December 17, 2026

Identifier

27-111

NAICS

236220

The City of Nacogdoches is seeking proposals to build a new Central Fire Station No. 1 and deliver its associated equipment and site improvements. - Government buyer: City of Nacogdoches, Texas; Nacogdoches Fire Department. BRW Architects is identified as the recipient for written questions about bidding documents. - Main requirement: Construct an approximately 17,408-square-foot, two-story fire station with a museum, living and sleeping quarters, training and administration spaces, four apparatus bays, and support areas. Include site and utility work, paving, parking, landscaping, irrigation, and retaining walls. - Building and shelter: Steel-frame construction with light-gauge framing, CMU in the apparatus bay and storm shelter, and brick and metal-panel exterior finishes. Provide a 48-person tornado shelter designed to ICC 500-2020 and 250 mph wind speed, with protected openings, ventilation, lighting, signage, emergency power, and testing/commissioning. - Named OEMs and vendors: APC (Galaxy VS UPS); Cummins (C450N6 generator); Intellihot (iQ251 water heater); UniMac (UYN055 washer); Ingersoll Rand (7100K10 compressor and DB59EC air dryer); Coxreels (P-LP-350 hose reel); and Park (SOCMP-500 separator and SWB-1 sump/sample well). No construction contractor is named. - Equipment quantities: One each of the two APC Galaxy VS UPS configurations, Cummins generator, 600A automatic transfer switch, Intellihot water heater, UniMac washer, Ingersoll Rand compressor and air dryer, Coxreels hose reel, Park oil/sand separator and sump/sample well, and emergency responder radio BDA system. - Notable technical requirements: The UPS schedules show differing ratings and runtimes for the same APC part number, which should be reconciled. Cummins generator information is inconsistent: the equipment schedule identifies a 450 kW C450N6, while notes also reference 750 kW/C750N6 and an 800A breaker. The shelter requires emergency power and code-compliant life-safety features. - Deduct alternates: Remove the southern asphalt parking lot and four light poles; omit two aluminum canopies; omit built-in bed frames; use louvered blinds instead of roller shades; remove specified covered-patio screen-wall, parapet, and soffit elements; and remove the northeast entry tower. - Additional services: Commission and test the UPS/energy-storage systems, provide owner training and closeout documentation, and complete shelter testing and commissioning. The stated construction duration is 425 calendar days to substantial completion, followed by 30 days to final completion; the project manual contains an apparent wording inconsistency in the substantial-completion duration.

Description

The solicitation seeks construction services for a new Central Fire Station No. 1 in Nacogdoches, Texas, including associated site and utility work. The approximately 17,408-square-foot facility will include a fire museum, living and sleeping quarters, training and administration spaces, four apparatus bays, and support spaces. The scope also includes parking, driveways, retaining walls, and other site work. Bids are due December 17, 2026, at 2:00 PM; a virtual, non-mandatory pre-bid meeting is scheduled for November 20, 2026.

View original listing