Opportunity
Utah Public Procurement Place U3P #ITB 2026-19
Construction and equipment for Lincoln Beach Well House #3
Posted
November 16, 2026
Respond By
December 04, 2026
Identifier
ITB 2026-19
NAICS
237110, 237990
Utah County Public Works is seeking a contractor to build and equip Lincoln Beach Well House #3 as a complete drinking-water facility. - Government buyer: Utah County Public Works Department, Utah County; office: Public Works Department. - OEM: Grundfos is the specified pump manufacturer and design model; an approved equal is permitted. - Pump: One Grundfos 62S100-20 deep-well submersible vertical turbine pump and 10 HP motor, designed for 50 gpm and 465 feet of total dynamic head, with a 2-inch column and 175-foot setting depth. - Construction and installation: Build a reinforced cast-in-place concrete well house and complete associated sitework, piping, controls, and systems. The contractor provides the labor, materials, equipment, transportation, and other resources needed to complete the work. - Scope includes interior piping and valves, flow meter, bulk sodium hypochlorite chlorination and turbidity systems, pump-to-waste and discharge piping, storage-tank connection, meter vault, HVAC, electrical and control panels, CCTV, grading, restoration, and fencing. - Work also includes testing and commissioning, including a 10-day commissioning period and a final acceptance test with three days of operation for eight continuous hours per day. - Other named platforms: U3P and Bonfire (EUNA) are identified for bid submission; they are not product suppliers. - Completion: The project must be completed during 2027.
Description
Utah County seeks a qualified contractor to construct and complete a concrete cast-in-place drinking water well house equipped with a submersible 10 HP pump. Work must comply with the specifications and Lincoln Beach Well House #3 plans referenced in the ITB. The contractor must provide the labor, materials, transportation, tools, equipment, supplies, disposal fees, and other costs required to complete the work. A mandatory pre-bid meeting is scheduled at the worksite on November 24, 2026.