Opportunity

New York State Contract Reporter #IFB 26-083

Construction of a ClearSpan-or-equal salt storage barn at Buffalo Psychiatric Center

Posted

November 16, 2026

Respond By

December 08, 2026

Identifier

IFB 26-083

NAICS

236220, 238190

The New York State Office of Mental Health is seeking a contractor to build a salt storage barn at Buffalo Psychiatric Center. - Government buyer: New York State Office of Mental Health; Buffalo Psychiatric Center; Bureau of Procurement Enterprise Services. - Location and scope: Adjacent to Building 22 in Buffalo, New York. Work covers excavation and subbase preparation, a sloped concrete slab, a U-shaped precast-block knee wall, shelter installation, and site restoration. - Named OEMs and products: ClearSpan is the specified shelter manufacturer, or an approved equal. Sika products are referenced for Sikaflex-like joint sealant and Sika H1000 penetrating siloxane sealer. - Key products and quantities: One steel-framed fabric shelter, 26 ft by 36 ft by 12 ft 10¾ in (excluding the knee wall), with white 12.5-ounce/24-mil fabric; other specified materials include #2 crusher-run stone, 8-ounce nonwoven geotextile, 4,500-psi concrete, #4 epoxy-coated reinforcing bars, interlocking precast bin blocks, joint sealant, and surface sealer. Quantities are otherwise not stated. - Notable requirements: Shelter must meet Buffalo wind and snow loading requirements and include necessary anchoring accessories. Concrete joints use a 10-by-10-ft windowpane pattern. A one-year workmanship and materials warranty is required; the shelter framing and fabric are covered by the manufacturer's standard warranty. Facility approval of submittals is required at least five days before related work. - Participation goals: 6% SDVOB, 16% MBE, and 14% WBE. - Schedule: Complete within 45 calendar days after notice to proceed. Facility-directed weather shutdowns to protect concrete placement and curing are excluded from the completion period.

Description

The solicitation seeks installation of a salt storage barn adjacent to Building 22 at Buffalo Psychiatric Center. Work includes excavation and subbase placement, construction of a concrete slab, installation of a U-shaped precast concrete block knee wall, erection of a steel-framed fabric shelter, and restoration of the surrounding area. The work is to be completed within 45 calendar days after notice to proceed, subject to specified weather-related shutdown exclusions. Bids are due December 8, 2026, at 3:00 PM ET; an optional site visit is scheduled for November 23, 2026.

View original listing