Opportunity
Santa Cruz Opengov #RFQ No. Parks and Recreation -0335
Engineering design and construction support for the Santa Cruz Wharf South Landing
Posted
November 16, 2026
Respond By
December 15, 2026
Identifier
RFQ No. Parks and Recreation -0335
NAICS
541330
The City of Santa Cruz is seeking engineering services to plan and design a new landing at the south end of the Santa Cruz Wharf. - Government buyer: City of Santa Cruz, Parks and Recreation Department. - OEMs and vendors: No product manufacturers, vendors, or prospective engineering firms are named in the opportunity. - Project: Wharf South Landing, between Bents 148–169, for temporary mooring of vessels up to 200 tons and approximately 120 feet long. - The concept includes a fixed platform approximately 20 feet by 75 feet, an access ramp approximately 200 feet by 12 feet, and a gangway. - Requested services: - Develop three concept alternatives and a 15% design plan set; analyze design waves using a 1% annual-chance (100-year) condition and prepare a wave study report. - Prepare 50% and 100% design plan sets, project specifications, construction cost estimates, and an estimated construction schedule. - Support environmental review and regulatory permit applications, construction bidding, and construction-phase engineering. - Prepare final as-built drawings and annotated specifications in PDF and AutoCAD or equivalent formats. - Construction support assumptions: Review 15 contractor submittals, respond to 10 RFIs, conduct four site visits, review six change orders and four payment requests, and support completion and punch-list activities. - Notable requirements: The access ramp must meet ADA standards. Final plans must be signed and suitable for competitive bidding, and specifications must follow CSI division format.
Description
The City of Santa Cruz is seeking an engineer to prepare concept and final engineering plans and specifications for construction of the Santa Cruz Wharf South Landing. The project is at the seaward end of the wharf between Bents 148–169, and includes a landing platform and access ramp. The scope also includes planning and design deliverables, cost estimates, a project schedule, bid support, and engineering support during construction. The City intends to proceed with planning, environmental review, and permit applications, with construction to be completed no later than 2034.