Opportunity

Three Valleys Muni Water Dist Planet bids #26-009

OT/SCADA virtualization servers, storage, power equipment, licenses, and support

Posted

November 12, 2026

Respond By

January 15, 2027

Identifier

26-009

NAICS

423430, 423690

Three Valleys Municipal Water District is seeking a resilient replacement platform for its operational technology and SCADA servers. - Government buyer: Three Valleys Municipal Water District, Engineering Department; Claremont, Los Angeles County, California. - Procurement: OT/SCADA virtualization hardware, software licenses, power and network equipment, and manufacturer support to replace two end-of-life servers. - Minimum design: Three identical compute nodes; hyperconverged designs require at least four. Storage must provide at least 19 TB usable, expand to 38 TB, and deliver at least 30,000 IOPS at under 1 ms latency under specified failure conditions. - Main equipment: Two N+1 lithium-ion UPS units, smart metered rack PDUs, a 120V automatic transfer switch, and any required network equipment. A redundant pair of Fortinet switches is conditional on existing FortiSwitch ports being insufficient. - Licenses: VMware vSphere Foundation 9.x or later for all proposed node cores; Microsoft Windows Server Datacenter core licenses for all physical cores; and 40 Microsoft SQL Server Standard per-core licenses. - OEMs highlighted: Fortinet; Broadcom/VMware; Microsoft; and example server manufacturers Dell (PowerEdge), HPE (ProLiant), Lenovo (ThinkSystem), and Cisco (UCS C-Series). Veeam and Object First are named as existing backup-infrastructure platforms. - Other named vendors/bidders: AIXTEK (dba Eaton & Associates), Axelliant LLC, BlueAlly, Charity IT, Concourse Tech, International Cloud Business Inc, Platinum Micro, Inc., Systems Services International LLC, and The Drala Project, Inc. No awardee is identified. - Support and requirements: Three years of manufacturer support, with optional five-year pricing, beginning at District acceptance. Support includes 24x7x365 phone access, one-hour acknowledgment for Severity 1 incidents, direct manufacturer-engineer access, and onsite parts and labor response within 24 hours of diagnosis. Failed drives/media are retained by the District. - Other notable requirements: Resilient power and network paths, no single point of failure, N+1 capacity, security controls, offline operation without required internet connectivity, and compatibility with VMware vSphere 9.x or later. District staff handle installation, configuration, software deployment, and migration; equipment delivery is targeted within 60 days after purchase order.

Description

Three Valleys Municipal Water District seeks proposals to furnish and deliver hardware for its Operational Technology (OT)/SCADA virtualization environment. The procurement includes virtualization servers and storage, a redundant distribution switch pair if existing FortiSwitch ports do not meet requirements, and UPS battery backup with rack power distribution units. Proposals must include three years of manufacturer maintenance and support, with optional five-year pricing; installation and configuration will be performed by District staff. Electronic proposals are due January 14, 2027, at 5:00 PM Pacific Time, submitted as separate technical and cost proposal PDFs through PlanetBids.

View original listing