Opportunity
Incline Village General Improvement District (IVGID) Planet bids #148317
IVGID Tennis Center court reconstruction and storm drainage improvements
Posted
November 13, 2026
Respond By
December 17, 2026
Identifier
148317
NAICS
237990, 238990, 237310
IVGID is seeking a contractor to rebuild tennis courts and improve drainage at its Incline Village Tennis Center. - Buyer: Incline Village General Improvement District (IVGID), Public Works Department; project contact identified as Bree Waters, District Asset & Project Manager. The work is in Incline Village, Washoe County, Nevada. - Base construction: Reconstruct Courts 3–7, including demolition, aggregate-base preparation, asphalt pavement, acrylic surfacing and striping, court nets, separator fencing, and curb/fence repairs. The asphalt recommendation is a minimum 3-inch surface over 6 inches of Type 2, Class B aggregate base, with a specialty smooth-surface mix and court coating. - Drainage and site work: Improve drainage serving courts, parking, and driveway; clean and camera-inspect existing drains; install storm-drain infrastructure and five stormwater basins; grade basins and riprap spillways; and restore disturbed areas. Basin design must address the TRPA 20-year, 1-hour storm criterion described in the plans. - Alternates: Alternate A offers post-tension concrete with surfacing for Courts 3–7; Alternate B offers post-tension concrete with surfacing for Courts 1–2; Alternate C offers asphalt reconstruction for Courts 1–2. Bid items are generally lump sum; equipment quantities are not specified. - Named manufacturers: Douglas Sports equipment includes nets (#20045/TN-45), anchors (#63428), straps (#20600), post sets (#63034SS), and sleeves (#63171). Beacon Athletics is specified for fence guards; windscreens (#21640Z) are Douglas Sports or approved equal. - Notable requirements: Phase construction to keep at least three courts open; plans describe alternating work so Courts 3–4 remain open during work on Courts 5–7 and vice versa. Requirements include prevailing wages, erosion and tree protection, traffic control, testing and inspection, and coordination with TRPA requirements. Black Eagle Consulting is named in the geotechnical report supporting the court reconstruction recommendations.
Description
The project reconstructs and resurfaces tennis courts 3–7, including removal and replacement of asphalt and acrylic surfaces, aggregate-base preparation, new surfacing and striping, and fencing work. Drainage improvements cover the courts, parking lot, and driveway, including inspection and cleaning of existing drain pipes, new inlets, and construction of drainage basins. Work must be phased so that at least three courts remain open at all times. Bid alternates include post-tension concrete court construction and reconstruction or resurfacing of courts 1 and 2.