Opportunity

City of Toledo PlanetBids #10009060

Emerald Avenue Shared-Use Path and Roadway Reconstruction

Posted

November 13, 2026

Respond By

December 08, 2026

Identifier

10009060

NAICS

237310, 237990, 237110

The City of Toledo is seeking a contractor to reconstruct Emerald Avenue and build a shared-use path in Toledo, Ohio. - Buyer: City of Toledo; documents identify the Department of Public Works/Division of Engineering Services and the Department of Transportation/Division of Engineering and Construction Management. The Division of Purchases and Supplies is also named in the labor-agreement documents. - Project: Approximately 0.91 miles from Anthony Wayne Trail to Ottawa Street, including an approximately 11-foot-wide asphalt shared-use path, intersection redesign, roadway narrowing, curb and sidewalk work, drainage improvements, water-system work, pavement markings, landscaping, lighting foundations, and traffic control. - OEMs and vendors: No OEM or product manufacturer is specified. Prospective bidders named in the notice are asdfghjkl, Crestline Paving & Excav. Co., Inc., ETNA SUPPLY CO, GovGuide, Oregon Tree Service, and The Shelly Company—Northwest Division; these names do not indicate an award. Labor-agreement documents name the Northwestern Ohio Building Trades Council, AFL-CIO, the Northwest Ohio Building and Construction Trades Council (NWOBTC), and affiliated local unions. - Major quantities: 11-foot-wide path; 166 cubic yards of asphalt surface course and 243 cubic yards of intermediate course; 10,922 square feet of concrete walk; 3,543 linear feet of underdrain; 305 linear feet of 12-inch ductile iron pipe; 4 hydrant assemblies; 15 catch basins; 11 trees to be planted; and 8 utility-provided street-lighting pole foundations to be installed. See line items for the full schedule, quantities, and bid item numbers. - Notable requirements: ODOT-prequalified contractor; 6% SBE goal; prevailing wages and domestic-origin materials; accepted Storm Water Pollution Prevention Plan before earth disturbance; safe access to Maya Park; and a Project Labor Agreement when the contract is at least $100,000 and funding does not exclude PLAs. The PLA covers contractors and subcontractors and includes required conference and execution steps. - Performance: Complete within 120 days from the Notice to Proceed; work is to commence within 10 days of that notice. No specific contract value is provided.

Description

The City of Toledo is seeking bids to construct 0.91 miles of shared-use path on Emerald Avenue, from Anthony Wayne Trail to Ottawa Street. The work includes an 11-foot-wide asphalt path, geometric redesign of intersections, roadway narrowing with curb replacement, and minor drainage improvements. Bids must be submitted electronically through the City of Toledo PlanetBids portal by December 8, 2026, at 1:30 p.m. The project requires an ODOT pre-qualified contractor, and the stated project duration is 120 days.

View original listing