Opportunity

New York State Contract Reporter #IFB 26-082

Construction and installation of a salt storage barn at Western NY Psychiatric Center

Posted

November 16, 2026

Respond By

December 08, 2026

Identifier

IFB 26-082

NAICS

236220, 238190

New York is seeking a contractor to build and install a road-salt storage barn at Western NY Psychiatric Center. - Government buyer: New York State Office of Mental Health (OMH), through Buffalo Psychiatric Center; the solicitation also identifies the Bureau of Procurement Enterprise Services. - Project location: Adjacent to Building 81 at Western NY Psychiatric Center in West Seneca, Erie County, New York. - Main requested work: Excavate and prepare the site; install geotextile and compacted stone subbase; construct a concrete slab and knee wall; erect a fabric-covered steel shelter; apply sealant; and restore the surrounding grade and lawn. - Shelter and named manufacturers: ClearSpan is specified for the steel-framed arch shelter, or an approved equal. The shelter is 26 ft wide by 36 ft long and 12 ft 10¾ in high, with one end closed, white 12.5-ounce/24-mil fabric, anchoring accessories, and capacity for Buffalo-area wind and snow loads. Sika and its Sikaflex sealant are named in the material specifications; the specified penetrating siloxane sealer is Sika H1000. - Other specified materials: #2 crusher-run stone; 8-ounce non-woven geotextile; 4,500-psi concrete; #4 epoxy-coated reinforcing bars; and interlocking precast concrete blocks for a U-shaped knee wall. Blocks are 24 in high by 24 in wide, in 24-, 36-, or 72-in lengths, with a rock-face pattern on one side. - Quantities and part numbers: No purchase quantities are stated. Sika H1000 is the only identified product designation; no separate part numbers are provided. - Notable requirements: Complete the work within 45 calendar days after notice to proceed, excluding qualifying facility-directed weather shutdowns. A one-year workmanship and materials warranty is required, in addition to the shelter manufacturer’s standard framing and fabric warranty. Participation goals are 6% SDVOB, 16% MBE, and 14% WBE.

Description

The solicitation seeks installation of a salt storage barn adjacent to Building 81 at Western NY Psychiatric Center. Work includes excavation and subbase preparation, a concrete slab, a U-shaped precast concrete block knee wall, and erection of a steel-framed arch fabric shelter, followed by restoration of the work area. The work is to be completed within 45 calendar days after notice to proceed, subject to specified climate-related shutdowns. Bids are due December 8, 2026, at 3:00 PM ET; an optional site visit is scheduled for November 24, 2026.

View original listing