Opportunity
Nevada Ionwave #ITB 9139 Addendum 2
Mackay Science HTHW Heat Exchanger, Valves, Pumps, and System Replacement
Posted
October 15, 2026
Respond By
November 19, 2026
Identifier
ITB 9139 Addendum 2
NAICS
238220, 238210, 238290
The University of Nevada, Reno is seeking a contractor to replace and modify heating-system equipment in Mackay Science. - Government buyer: University of Nevada, Reno (UNR), Facilities Services Planning & Construction. - Scope: Replace the high-temperature hot-water (HTHW) heat exchanger, control valves, pumps, associated piping, and equipment; modify electrical systems, controls, and concrete equipment pads. - OEMs and vendors: No equipment OEMs, manufacturers, or product vendors are identified. The job-walk attachment names UNR and facilitator James Del Castillo; it does not identify participating companies by name. - Products: HTHW heat exchanger, control valves, pumps, and associated piping and equipment. No quantities, part numbers, brands, or models are specified. - Notable requirements: Prevailing-wage construction; qualified welders are required for HTHW distribution-system work. Work is intended outside the heating season, preferably when the building is mostly unoccupied and its primary heating system is not in use. Partial bids are not accepted. - Estimated project value: $274,000–$374,000. - Attachment information: A job walk for the project is documented, but the sign-in sheet adds no product quantities or additional scope.
Description
This prevailing-wage project replaces the HTHW heat exchanger, control valves, pumps, and associated piping and equipment in Mackay Science. The work also includes modifications to existing electrical systems, controls, and concrete equipment pads. Qualified welders are required for welding on the high-temperature hot-water distribution system. Work is scheduled to begin May 18, 2027, and be complete by September 3, 2027; the estimated cost range is $274,000–$374,000.