Opportunity

Gwinnett County Bids #IWQ135824

Two aluminum storefront assemblies and installation for Gwinnett County Sheriff’s Office

Posted

November 14, 2026

Respond By

November 23, 2026

Identifier

IWQ135824

NAICS

238150, 332321

Gwinnett County is seeking quotes to furnish and install two aluminum storefront assemblies at the Sheriff’s Office. - Government buyer: Gwinnett County; Gwinnett County Sheriff’s Office; Department of Financial Services, Purchasing Division. - Requested assemblies: - One custom unequal-leaf double-door storefront, quantity 1: 72 × 96-inch opening, 32- and 36-inch outward-swinging leaves, clear safety glazing, and clear-anodized aluminum framing. - One aluminum-framed clear-glass wall with centered 36-inch outward-swinging door, quantity 1: 204 × 96-inch opening; fixed-panel dimensions set by field measurements and approved shop drawings. - Named OEMs and hardware: Von Duprin 33 Series exit devices, Corbin 195-U280 keyed cylinder, and LCN 404XP door closer; approved equivalents are permitted. The second assembly also requires commercial-grade rim exit hardware and keyed-cylinder trim compatible with Sheriff’s Office keying requirements. - Installation and related work: Verify measurements and site conditions; provide complete framing, glazing, hardware, thresholds, sweeps, seals, anchorage, and accessories; install, adjust, and test both assemblies; protect adjacent surfaces, clean up, remove debris, and train Facilities Management staff on hardware operation. - Notable requirements: Clear tempered safety glazing, outward-swinging doors, egress and key-control compatibility, approved shop drawings, and a minimum one-year workmanship warranty in addition to applicable manufacturer warranties. No project duration is specified; vendors are to state estimated completion time in their quotes.

Description

Gwinnett County is requesting competitive quotes for the purchase and installation of two new commercial-grade aluminum storefront assemblies at the Gwinnett County Sheriff’s Office. The assemblies consist of a custom unequal-leaf double-door entrance and a clear-glass wall with a centered single entrance door, both using clear safety glazing and aluminum framing. Work includes verifying site conditions and measurements, providing and installing the assemblies and associated hardware, adjusting and testing doors and hardware, protecting and cleaning the work area, and training facilities staff. The pre-quote conference is scheduled for November 13, 2026, and quotes are due November 23, 2026.

View original listing