Opportunity
Hennepin County Procureware #2211300
Hennepin County Douglas Drive Safety Improvements and Signal Systems
Posted
November 14, 2026
Respond By
December 08, 2026
Identifier
2211300
NAICS
237310, 237130
Hennepin County is seeking bids for roadway safety improvements on Douglas Drive in Crystal, Minnesota. - Government buyer: Hennepin County, through its Transportation Department and Purchasing Department; project CP 2211300. - Project scope: Grading, bituminous surfacing, ADA improvements, and traffic-signal work on CSAH 102 between 32nd Avenue North and Fairview Avenue North. - Signal and roadway equipment: Two traffic control signal systems (Item 2565.516, quantity 1 each) at 42nd Avenue North and 36th Avenue North, plus one pedestrian crosswalk flasher system (Item 2565.616) at Fairview Avenue North. Hennepin County provides the signal cabinets and specified equipment; the contractor supplies and installs the remaining system materials and equipment. - Named OEMs: Axis Communications — AXIS Q6358-LE 4K UHD AI-powered PTZ monitoring camera; Miovision — SmartView 360-degree video detection cameras; TAPCO — the most current model of its pedestrian crosswalk flasher system. Camera quantities are not stated. - Other materials: New loose-tube, single-jacket, single-armored single-mode fiber optic cable, specified as 144-fiber and 48-fiber cable; lengths and quantities are not stated. - Construction services and items: Construction surveying and as-built deliverables (2011.601, lump sum); traffic control, traffic control supervision, and alternate pedestrian route (2563.601, lump sum); street sweeping with pickup broom (2123.610, hourly); erosion control supervision (2573.501, lump sum); and on-the-job training (2041.610, 500 hours, goal of 3 trainees; item 2041.610). - Notable requirements: ADA/PROWAG accessibility, protected-species measures, federal domestic-content rules, coordination on tribal employment, workforce goals of 32% minority and 20% women, and accessible alternate pedestrian routes during construction. - Schedule: Construction is scheduled to begin after contract award according to the project schedule. Acceptance and final-completion milestones are specified in the project documents, including a final-completion period of 90 calendar days after receipt of the semi-final estimate.
Description
Hennepin County is soliciting bids for safety improvements on CSAH 102 (Douglas Drive) between 32nd Avenue North and Fairview Avenue North in Crystal, Minnesota. Work includes grading, bituminous surfacing, ADA improvements, and signal system revisions. Bids are to be submitted electronically through Hennepin County ProcureWare by December 8, 2026, at 2:00 PM.