Opportunity
E-Rate #270004409
School-site cabling infrastructure and single-mode fiber installation
Posted
November 13, 2026
Respond By
December 11, 2026
Identifier
270004409
NAICS
238210
Elverta Joint Elementary School District is seeking contractors for an E-rate school-site cabling infrastructure project. - Government buyer: Elverta Joint Elementary School District; office: Main Office. No sub-agency is identified. - Current procurement: Cabling infrastructure, including CAT6/CAT6A or equivalent cabling and approximately 1,000 feet of single-mode fiber linking MDF and IDF locations. - Materials and work: Provide 12-strand fiber supporting speeds up to 100 GB, LC connectors, surface-mount boxes, CAT6A keystone jacks, faceplates, 24-port modular patch panels, patch cords, and J-hook supports. Remove existing wiring, install and label cabling, and test and certify each run. - Notable requirements: Provide electronic test results for every fiber strand, raw VISIO as-built drawings, a 25-year cabling warranty, and a 2-year workmanship warranty. Reuse existing infrastructure and equipment where specified; relocate IDF switches as needed. - OEMs and vendors: No cabling OEM or specific product part number is identified in the current cabling attachment. Aruba is named in related Form 470 material as an option for four switches and necessary software and licenses (“Aruba or equivalent”); the earlier switch power-supply request is not part of the latest attachment list. - Performance: Provide an implementation timeline beginning in spring 2027, with the project completed by the requested late-summer 2027 target. E-rate eligible goods and services are subject to applicable funding rules.
Description
Elverta Joint Elementary School District is soliciting proposals for cabling infrastructure under RFP 27-110. The work includes CAT6 or equivalent cabling, approximately 1,000 feet of single-mode fiber from the MDF to IDFs, and equipment needed for a complete project at the school sites. The attached RFP states proposals are due January 8, 2027, by 3:00 p.m., and requests project completion by August 1, 2027.