Opportunity

Delaware My Market Place #DSU-PC-26-008

Alumni Stadium Phase 1 site electrical reconfiguration for Delaware State University

Posted

November 13, 2026

Respond By

December 09, 2026

Identifier

DSU-PC-26-008

NAICS

238210, 237130

Delaware State University is seeking a general contractor for site electrical work supporting its Athletic Transformation Project. - Buyer: Delaware State University, Office of Planning & Construction; Alumni Stadium, Dover campus. - Procurement: Contract PC-26-008, Phase 1 Bid Pack A—site electrical reconfiguration. Work includes altering utilities around the locker room and south stands, replacing electrical power and lighting systems, and coordinating with demolition and future stadium construction. - Named OEMs and manufacturers: 3M (cable termination products); Square D (variable-frequency controllers and active harmonic filters); Schneider Electric (including Square D products); ASCO (manual transfer switches); General Electric and Eaton Cutler-Hammer (panelboards). No specific contractor or reseller is named. - Major equipment and materials: 15 kV medium-voltage cable and terminations; pad-mounted and low-voltage transformers; power and lighting panelboards; service entrance equipment; breakers, safety switches, controllers and contactors; lighting controls; manual transfer switches; portable generator/load-bank connection cabinets; structured voice/data cabling; and underground ducts, ductbanks and manholes. Equipment ratings, routing, configurations, and most quantities are determined by the project drawings; quantities are not stated in the available summaries. - Identified models/designations: Type DS-4000 surface raceway; Category 6 cable model C6RPXX; patch cord model HC6XXXX; Square D AccuSine+ active harmonic filter; Schneider Electric ASCO 300 Series manual transfer switch. No quantities are specified for these items. - Notable requirements: Preserve existing data cabling at the south edge of the football bleachers for future reconnection. Active harmonic filters require manufacturer-representative commissioning, functional testing, a certified factory acceptance test report, and at least two hours of training for eight Owner staff. Owner training is also required for applicable electrical systems. The scope includes a $100,000 owner contingency allowance; the specifications also describe one year of variable-frequency-controller maintenance and a separate two-year medium-voltage-transformer maintenance alternate. - Schedule: Construction is anticipated to start in late 2026; no completion date or total duration is specified.

Description

Delaware State University seeks bids from general contractors for site electrical reconfiguration to support its new Athletic Transformation Project. Work must comply with the approved bid documents, project specifications, and applicable codes and standards. Bids are due December 9, 2026, at 3:00 PM local time, and must include bid security equal to 10% of the bid amount and additive alternates. The successful bidder must provide performance and payment bonds equal to 100% of the contract price.

View original listing