Opportunity
SAM #140RR027Q0034
Folsom Powerplant Hydrogenerator Bearing and Thrust Runner Repair Services
Buyer
RECLAMATION CONTRACTING ACTIVITY
Posted
November 12, 2026
Respond By
November 19, 2026
Identifier
140RR027Q0034
NAICS
333613, 811310, 333611
The U.S. Bureau of Reclamation is seeking repair and refurbishment of Folsom Powerplant hydrogenerator bearing components and a thrust runner. - Government buyer: U.S. Department of the Interior, Bureau of Reclamation; California-Great Basin Region, Central California Area Office, Folsom Powerplant. The solicitation is issued through the Reclamation Contracting Activity. - OEMs and vendors: No OEMs, manufacturers, or contractor vendors are named in the provided notice or attachment summaries. - Requested services and components: Repair, refurbish, inspect, machine, and test Government-furnished components for hydrogenerator Units 1, 2, and 3: - 12 thrust-bearing shoes (THBG), including applicable Babbitt work and HPL-system inspection/testing; no new shoes are to be supplied. - Designated THBG shoes modified for the specified RTD or temperature-device design; the number of shoes is not specified. - 1 turbine guide bearing (TGB), including a new RTD port and applicable repairs. - 18 upper guide-bearing (UGB) shoes, including applicable rebabbitting, machining, or insert work. - 8 lower guide-bearing (LGB) shoes, including RTD/Mercoid port work on 2 designated shoes. - 1 thrust runner, to be inspected, repaired, resurfaced, machined, and prepared for long-term storage. - Final inspections, required reports, as-built drawings for modifications, and protective packaging. - Notable technical requirement: The Unit 2 turbine guide bearing drawing specifies an RTD modification, including a fabricated solid plate and RTD head mount in place of the existing site-glass retainer, with a new 1/4-inch RTD routed to the mount. The drawing also specifies Grade 5 hex bolts. - Performance period: 120 calendar days after receipt of all Government-furnished components. Initial inspections and reports are due within 30 days after receipt; remaining work and packaging are due within the 120-day period.
Description
The purpose of this requirement is to repair, refurbish, inspect, machine, and test Government-furnished bearing components and a thrust runner for the Folsom Powerplant hydrogenerators, Units 1, 2, and 3.