ODOT Region 1 is seeking bids for roadway, traffic-safety, and lighting improvements along US 26 in Multnomah County. - Government buyer: State of Oregon, Oregon Department of Transportation (ODOT), Region 1. - Project: US 26 at SE 67th and SE 80th to SE 82nd, on the Mount Hood Highway; work covers approximately 0.77 miles. - Scope: Extend a median island and build a concrete traffic separator; perform paving, curb-ramp, illumination, and pavement-marking work, plus related construction. ODOT will furnish a new illumination pole and luminaire. - Bid quantities: 290 ft stripe removal; 51 ft 13-inch-deep asphalt sawcutting; 16 cu yd excavation; 310 sq yd 2-inch cold-plane removal; 16 tons aggregate base; 20 tons Level 3, 1/2-inch asphalt concrete pavement; 705 sq ft concrete islands; 24 sq ft truncated domes; 19 each bi-directional yellow Type IAR markers; 19 each surface-mounted tubular markers; 400 ft profiled thermoplastic marking; and 3 Type B-HS arrow legends. - Other listed work: Additional bid-form items include sawcutting, geotextile, aggregates, asphalt pavement, concrete curbs, ecology blocks, and bridge removal; quantities are itemized below. The pricing attachment also contains bid items for a second project, identified separately where applicable. - Notable requirements: Provide work-zone traffic and pedestrian protection, a pollution-control plan, and a written lead-compliance plan for contaminated areas. Manage and reuse approximately 1 cu yd of contaminated shoulder soil. High-early-strength concrete must reach 3,000 psi within 72 hours. Prevailing-wage, utility-locating, and approved work/traffic-control planning requirements apply; coordinate with ongoing Powell ADA ramp work. Performance and payment bonds are required. - Estimate and schedule: Bonding-purpose estimate is $100,000–$250,000. Work may begin no earlier than March 2027; substantial completion is due in September 2027, followed by final completion later that month. Liquidated damages are $600 per calendar day after the substantial-completion deadline. - OEMs/vendors: No commercial OEMs, manufacturers, or contractors are named. ODOT is the buyer; OregonBuys is the bid submission platform.
Description
The solicitation seeks a contract for construction work on the US 26 project in Multnomah County, including labor, materials, transportation, equipment, permits, and related services. Work includes constructing a median island extension and concrete traffic separator, installing an illumination pole and permanent pavement markings, and completing additional work specified in the plans and specifications. The project estimate for bonding purposes is $100,000 to $250,000, and the listed project dates are a start not before March 1, 2027, substantial completion by September 1, 2027, and final completion by September 15, 2027.