Opportunity
City of Watsonville #PK-26-09064-QB
Watsonville Pinto Lake Dock Replacement with EZ Dock System
Posted
October 02, 2026
Respond By
November 10, 2026
Identifier
PK-26-09064-QB
NAICS
237990, 238990
The City of Watsonville is seeking bids to replace the damaged Pinto Lake dock with an EZ Dock floating dock system. - Buyer: City of Watsonville, Parks & Community Services Department; Watsonville, California. - OEM: EZ Dock is the specified manufacturer; approved equals may be proposed. - Products: 24 floating dock sections (208010); 6 adjustable piling brackets (300810); 1 shoreline abutment kit (H40448, H4044, H40409, H40460, S9000, S40014); 20 bumper kits (S300180, 117005, 80515SS); approximately 476 linear feet of edging (S40016, 117003, 80515SS); and 38 tie-up cleats (30101, 80521SS). - Also requested: coupler sets and in-water installation tool (301100, 9000010); one G5000-series, 60-inch-wide gangway with guardrails and supports; aluminum base/decking (H4044, H40409); gangway rollers (30300SS, S30330 1 DR, H40015, 105030/105035); and any accessories needed for a complete installation. Gangway length is inconsistent across the supplied information: the addendum specifies 20 feet, while an attachment lists 32 feet. - Services: Mobilization and general requirements; demolition and site preparation, including removal and legal disposal of approximately 235 linear feet of existing dock; and furnishing and installing the complete dock system. - Notable requirements: Protect the lake and limit lake-bed disturbance; use sediment/debris controls. Turbidity curtains may be secured to seawalls or supported by surface floats, but not anchored to the lake bottom. Contractor must hold a California Class A General Engineering or Class B Building license and active DIR public-works registration, and comply with prevailing-wage and certified-payroll requirements. Performance and payment bonds are required. - Value and schedule: Engineer’s estimate is $170,000. The addendum specifies completion within 15 working days after receipt of prefabricated dock materials; other supplied information ties work commencement to Notice to Proceed or written assignment. Liquidated damages are $250 per calendar day beyond the specified completion period.
Description
The City of Watsonville seeks bids to remove the existing damaged dock at Pinto Lake and replace it with a functional EZ Dock floating dock system. Work includes site preparation, demolition of approximately 235 linear feet of existing dock panels, and installation of dock sections, gangway components, piling brackets, edging, cleats, bumpers, and associated hardware. The contractor must meet specified material and installation standards and follow safety and environmental practices. The engineer’s estimate is $170,000.