Kern High School District is seeking construction bids to replace the modular restroom building at its ABLE site in Bakersfield. - Government buyer: Kern High School District, through its Facilities Planning and Business Services departments. - Main item: One 12-by-40-foot modular restroom building (480 sq. ft.), PC-approved under DSA PC #04-123318; stockpile identifier #04123318 and serial C-24-3099 are also referenced. The restroom-building manufacturer is not identified. - Work requested: Remove and return the existing toilet building to the District, install the replacement, and complete associated site, utility, electrical, and infrastructure work. Scope includes earthwork, trenching and backfill, concrete, paving, water, sewer and storm drainage, fencing, gates, landscaping, railings, signage, and fire-alarm modifications as indicated in the plans. - Named manufacturers/products: Honeywell — Notifier INSPIRE fire-alarm system, identified as the basis of design for modifications to the existing system; ASI Signage — In-Touch panel signage, identified as the basis of design. No quantities or part numbers are stated for these systems. - Notable requirements: The building is non-sprinklered; a photovoltaic system is not required. Construction and demolition waste salvage or recycling target is 65%. Signage and fencing carry five-year warranties, and a Class 3 inspector is required. Prevailing wages and DIR monitoring apply; there is a 3% DVBE participation goal or a documented good-faith effort requirement. - Performance: Work is anticipated to take 91 calendar days and must begin within five days after the Notice to Proceed. No option periods or annual subscription are stated. - Estimated project value: $250,000.

Description

The project calls for installation of one new 12’x40’ PC-approved relocated restroom building at the ABLE site. Work includes associated site work and electrical alterations, infrastructure improvements, and new fencing, gates, and landscaping as needed. The solicitation also identifies earthwork, utilities, and fire alarm work as possible scope elements, as indicated in the plans and specifications. The stated estimated value is $250,000, and the project duration is 91 calendar days.

View original listing