Opportunity

Utah Public Procurement Place U3P #EMC-FY27-10

Tickville Gulch channel restoration and drainage improvements

Posted

November 11, 2026

Respond By

December 01, 2026

Identifier

EMC-FY27-10

NAICS

237990

Eagle Mountain City Public Works seeks a contractor for channel restoration and drainage improvements along Tickville Gulch in Eagle Mountain, Utah. - Buyer: Eagle Mountain City, Public Works. - Scope: Install process-based channel restoration structures, gabions, and outlet improvements; seed disturbed areas; and provide GPS survey data and as-built drawings. - Named product: Geoweb GW30V6 outlet apron. Plans require it to be at least 24 feet long and twice the pipe diameter wide, filled and compacted with native material. The priced schedule lists 4,400 units; the plan set does not state a separate quantity. - Priced materials and work items: 1,200 untreated posts; 10 units of rock for Zuni Bowls; 16 gabion baskets sized 4.5×3×12 and 16 sized 3×3×12; 160 units of gabion rock; 6 project signs; 8,000 units of seed; and the structure installations detailed below. - Structure types and priced quantities: ALS bank-attached (7), ALS Bank Blaster (5), ALS channel-spanning (18), BDA (1), headcut treatment (5), PALS bank-attached (5), PALS Bank Blaster (29), PALS channel-spanning (24), PALS Rhino (65), and Zuni Bowl (2). Plans also identify PAL/ALS channel-spanning and mid-channel structures, PAL Rhino A and B, PAL/ALS bank-attached/Bank Blaster structures, BDA A and B, and gabions; quantities for these plan labels are not stated separately. - Other specified work: Replace 4 existing outfall structures; mobilization, permits, and demobilization (1); field coordination meetings and site visits (10); structure staking and layout (1); construction access and staging preparation (1); on-site material harvest and transport (4); off-site material harvest and transport (8); and GPS survey/as-built drawings (1). - Manufacturers and vendors: No OEM or contractor vendor is named in the provided materials. Geoweb is the named product specification; no manufacturer is identified.

Description

Eagle Mountain City is requesting proposals for the 2026 Tickville Channel Improvement Project along Tickville Gulch between Porter’s Crossing Parkway and Silver Lake Parkway in Eagle Mountain City. The work includes installing low-tech, process-based restoration systems and new gabions, replacing existing outfall structures, and seeding disturbed areas. Proposals are due December 1, 2026, at 12:00 PM MST, and attendance at the November 16, 2026, pre-bid meeting and site walk is mandatory. A bid bond equal to 5% of the total project is required with the proposal.

View original listing