Opportunity

Utah Public Procurement Place U3P #GJ27-132

ASP Composting System and Facility Design and Startup Services

Posted

November 10, 2026

Respond By

November 25, 2026

Identifier

GJ27-132

NAICS

562219

Wasatch Integrated Waste Management District is seeking an Aerated Static Pile composting system for its Davis Landfill campus in Layton, Utah. - Buyer: Wasatch Integrated Waste Management District (WIWMD), Purchasing Manager. - Procurement: Furnish and certify an ASP system with capacity for at least 20,000 tons of green waste annually, plus design integration, equipment-procurement support, and startup assistance. - System requirements: Positive aeration through sub-grade HDPE piping; a concrete pad floor; windrows about 12 feet high by 24 feet wide by 300 feet long; maintainable gravity leachate collection; and odor management without geosynthetic covers. The site area is approximately 10 acres. - Services and coordination: Provide 30% schematic design integration within 30 days after Notice to Proceed and coordinate with the District’s balance-of-plant design engineer, HDR, and the general contractor. Up to two cost or operational alternatives may be proposed without changing feedstock parameters. - OEMs and vendors: No ASP manufacturer or proposing vendor is named. HDR is identified as the balance-of-plant design engineer. - Notable requirements: Comply with Build America, Buy America Act and 2 CFR Part 200 grant requirements. Submit technical and cost proposals separately.

Description

Wasatch Integrated Waste Management District is soliciting qualifications-based proposals from composting system vendors for professional and technical services to design, procure equipment for, and assist with startup of a new Aerated Static Pile composting facility at the Davis Landfill campus in Layton, Utah. The system must support a minimum of 20,000 tons per year of green waste and meet the stated technology, odor-management, and federal grant compliance requirements. The selected vendor will furnish and certify the technology, provide 30% schematic design integration within 30 days of Notice to Proceed, and coordinate with the District’s design engineer and general contractor. Technical proposals must exclude pricing; itemized cost proposals must be submitted separately.

View original listing