Hydro-Québec substation building, civil, electrical, and control-system upgrades

Posted

November 10, 2026

Respond By

December 18, 2026

Identifier

20182666

NAICS

237130, 238210, 238220, 238110, 238190, 238990

Hydro-Québec is seeking contractors to upgrade the Poste Des Sources substation in Montréal (315-25 kV). - Government buyer: Hydro-Québec, through Hydro-Québec Bureau des soumissions. - Building and mechanical work: Demolition; architectural repairs; structural openings, reinforcement, sealing, and waterproofing; and electrical, plumbing, and ventilation work. - Civil and foundation work: Reinforced-concrete and prefabricated reinforced-concrete foundations; foundation cleaning and waterproofing; excavation and backfill; steel-structure dismantling and modifications; and drainage work. - Electrical work: Electrical equipment replacement and installation work involving bus ducts, grounding, and capacitor banks. - Control-system work: Cable and panel work, GPS antenna installation, and installation and fastening of an operator console. - OEMs and products: No OEMs, product models, part numbers, or product quantities are identified.

Description

The contract covers work at Montréal / Poste Des Sources, including building demolition and architectural, structural, and mechanical work. Civil work includes construction and installation of reinforced-concrete foundations, excavation and backfill, steel structure modifications, and drainage work. Electrical and control work includes replacing electrical equipment, bus ducts, grounding, capacitor banks, cable and panel work, GPS antenna installation, and operator console installation. The estimated contract period is 49 months, and the notice gives an indicative estimated value of $10,000,000–$20,000,000, including options.

View original listing