Opportunity

SAM #N3904026Q3149

Portsmouth Naval Shipyard rental of DCCUs, chiller, and chilled-water equipment

Buyer

Portsmouth Naval Shipyard

Posted

November 10, 2026

Respond By

November 16, 2026

Identifier

N3904026Q3149

NAICS

532412, 532490

Portsmouth Naval Shipyard is seeking a rental system to provide dry, temperature-controlled air for industrial spaces. - Government buyer: Department of the Navy, Naval Sea Systems Command (NAVSEA), Portsmouth Naval Shipyard (PNSY). - OEMs and vendors: No manufacturer, OEM, or vendor is named in the provided materials. - Equipment requested: - Four 10,000-CFM Desiccant Climate Controlled Units (DCCUs), DH-01 through DH-04; an alternate configuration lists three 15,000-CFM DCCUs. - One 230-ton chiller (DH-05) and one chilled-water pump (DH-06). - One each of 6-inch CHW hose (DH-07), 6-inch 90-degree elbows (DH-08), 4-inch CHW hose (DH-09), 4-inch 90-degree elbows (DH-10), 3-inch CHW hose (DH-11), 3-inch 90-degree elbows (DH-12), 6-inch-diameter globe valve (DH-13), and CHW manifold (DH-14). - Services: Equipment leasing, seasonal training, and monthly technical service. Lease duration may be extended or reduced as project needs require. - Notable requirements: Air-conveying equipment must have pre-wired remote emergency-stop capability. Each DCCU and the chiller must be frame- or skid-mounted and meet specified lifting and handling requirements.

Description

Portsmouth Naval Shipyard (PNSY) is seeking to lease a Desiccant Climate Controlled Unit (DCCU) system to provide dry and tempered process air for conditioning various spaces used for industrial applications. The system must include multiple DCCU’s, a chiller, chilled water pump, chilled water hose manifolds, hose assemblies as well as the associated onboard controls to operate both the chilled water system and DCCU’s. The intent of the chiller, pump, hose assemblies, manifolds and ancillary components is to establish a temporary chilled water system which serves all of the DCCU’s pre-cooling and post-cooling coils. All equipment conveying air to and from the industrial space must be pre-wired with remote E-Stop capability in order to provide a means to secure airflow in the event of an emergency response. Each DCCU and Chiller must be frame/skid mounted and meet the lifting & handling requirements as defined in the specification.

Period of Performance

Base: 12/14/2026 – 12/12/2027 (52 Weeks) , Equipment (DH-01 through DH-04) Base: 4/5/2027 – 10/3/2027 (26 Weeks) , Equipment (DH-05 through DH-14) Option 1: 12/13/2027 - 10/15/2028 (44 weeks) , Equipment (DH-01 through DH-04) Option 2: 10/16/2028 – 11/12/2028 (4 weeks) , Equipment (DH-01 through DH-04) Place of Performance: Portsmouth Naval Shipyard (PNSY), Maine

View original listing