Opportunity
SAM #SP330027Q0012
Design and Installation of a 500 kW Rooftop Solar PV System
Buyer
DLA Distribution
Posted
November 10, 2026
Respond By
December 09, 2026
Identifier
SP330027Q0012
NAICS
238210, 221114
DLA Distribution is seeking a contractor to deliver a 500 kW rooftop solar project at Building 56 in Tracy, California. - Government buyer: Defense Logistics Agency (DLA) Distribution, at Defense Distribution San Joaquin. - Opportunity: Solicitation SP330027Q0012 for design and installation of a 500 kW AC roof-mounted solar photovoltaic system. - Requested work: Provide labor, supervision, materials, tools, and equipment; complete final design based on site conditions, roofing materials, and selected components; and modify the existing electrical system as needed. - Site infrastructure: The building has a 12,470/408V, 3,000 kVA transformer, a 4,000A switchgear bus bar, and four available 1,200A-frame circuit-breaker spaces. - Requirements: Meet applicable local and California requirements, utility requirements, building codes, and technical, installation, and qualification standards. - OEMs and vendors: No OEMs, product manufacturers, or vendors are identified in the provided information.
Description
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at theDefense Distribution San Joaquin California.Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaicsystem for building 56. but not limited to:The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed thelisting and qualification tests. All design and installation shall comply with the most recent version of each document.The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistentwith and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame sizecircuit breaker spaces are available. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for SP330027Q0012Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module