Opportunity

Canyon School District Ionwave #27-00054CP-B Addendum 1

Phase 1 Central Warehouse Cooler-Freezer Refrigeration Upgrade

Posted

November 04, 2026

Respond By

November 20, 2026

Identifier

27-00054CP-B Addendum 1

NAICS

238220, 238210

Canyons School District is seeking a contractor to upgrade refrigeration at its Central Warehouse in Sandy, Utah. - Buyer and scope: Canyons School District (CSD), Central Warehouse; Phase 1 construction includes demolition, materials, labor, commercial refrigeration, and related electrical work. Phase 2 is excluded. - OEMs and named manufacturers: Krack equipment is specified for the new condensing unit and evaporator. General Electric is named for the existing panelboard; compatibility of the new breakers must be field verified. TED134125 is the specified breaker part number. - Major equipment: One Krack HDSD-2200LDM-JH-D condensing unit and one Krack MSD34E-0602DVKK evaporator. The electrical schedule also identifies one evaporator heater and one evaporator motor; neither has a separate part number. - Electrical items and work: Two TED134125, 125A, 208V, three-pole breakers for the new condensing units; remove and return two existing 100A breakers to the owner. Work also includes power, conduit, wiring, controls, a condensing-unit disconnect, and extending electrical heat trace. - Refrigeration work and notable requirements: Install new refrigerant piping and a heat-traced condensate drain, connect controls to the existing building system, and provide seismic restraint calculations and shop drawings as deferred submittals. The condensing unit must be mounted at least 12 inches above ground. Wall penetrations must be sealed weather-tight and interior penetrations firestopped. - Contractor requirements and risk items: Bidders must hold a Utah business license, have at least five years of commercial refrigeration installation experience, have completed similar work within the preceding six months, and attend the mandatory pre-bid conference and site visit. A $25,000 contingency requires written approval. A performance and payment bond is required before work begins, and liquidated damages are $500 per calendar day for late substantial completion. - Performance period: Work may begin after the specified start threshold; the substantial completion date is not provided. No option years or subscription terms are stated.

Description

This Request for Bid seeks competitive bids from qualified contractors for phase one commercial refrigeration services for Canyons School District. The project is intended to be delivered in two budget-based segments, and the bid scope is exclusively Bid Package 1 (Phase 1); Phase 2 will be solicited separately. The work includes construction services, including demolition, materials, and labor according to the provided design documents. Bidders must meet the stated Utah licensing and experience requirements and attend the mandatory pre-bid conference.

View original listing