Opportunity
North Carolina eVP #10474262-02-27
Jail and courthouse waste-pipe replacement and plumbing improvements
Posted
November 09, 2026
Respond By
January 07, 2027
Identifier
10474262-02-27
NAICS
238220
Lee County Government is seeking a contractor for Phase II waste-pipe replacement and plumbing improvements at its jail and courthouse in Sanford, North Carolina. - Buyer: Lee County Government of North Carolina, General Services; contact is Ryan Faulk, General Services Director. - Project/design: Lee County Jail/Courthouse Waste Pipe Replacement Phase II; designed by Dewberry Engineers. No product OEMs or manufacturers are identified. - Base-bid products and work: Replace cast-iron waste and vent piping in inmate cell pods A and B and the shared utility chase; install one floor sink and one lint interceptor in laundry room 1018. Piping quantities are not specified. - Alternate 1: Replace approximately 16 linear feet of below-slab cast-iron waste pipe in men's locker room 1035; replace three tank toilets with flush-valve toilets (two in the men's locker room and one in women's locker room 1058); provide new domestic water lines to the replacement toilets. Pipe length must be verified by the contractor. - Alternate 2: Replace approximately 50 linear feet of below-slab cast-iron waste pipe between offices 1038 and 1061. Pipe length must be verified by the contractor. - Notable requirements: Maintain jail operations; work requiring inmates to vacate a cell pod is limited to 30 days per pod, and pods A and B cannot be vacated at the same time. Detention-facility background checks and confidentiality requirements apply. - Schedule: Base work is 120 calendar days from commencement. Work must begin within 14 days after the executed agreement is received. Alternate 1 adds 15 calendar days; Alternate 2 adds 30 calendar days to the Alternate 1 schedule. Commencement is established by Notice to Proceed.
Description
Lee County seeks bids to replace waste piping in designated areas of its jail/courthouse building. The base bid includes replacement of cast-iron waste and vent piping in inmate cell pods A and B and their common utility chase, plus a floor sink and lint interceptor in the laundry room. Alternates cover additional waste-pipe replacement beneath the ground-floor slab, replacement of three toilets with flush-valve toilets, and new domestic water lines. Electronic bids are not permitted, and an in-person pre-bid meeting is mandatory.