Opportunity
Ivy Tech Community College Workday #BLFAC-27-002
Replace one Carrier 60-ton rooftop HVAC unit at Ivy Tech’s Indiana Center for Life Sciences
Posted
November 09, 2026
Respond By
December 11, 2026
Identifier
BLFAC-27-002
NAICS
238220, 238290
Ivy Tech Community College of Indiana is seeking a contractor to replace the Indiana Center for Life Sciences’ aging rooftop HVAC unit in Bloomington. - Buyer: Ivy Tech Community College of Indiana; Ivy Tech Community College - Bloomington office. - OEM: Carrier is specified for the replacement unit; the schedule identifies model 48V. - Product: One 60-ton rooftop unit (RTU-1), Carrier model 48V, with 22,000 CFM supply airflow, gas heat, DX cooling, R454B refrigerant, and MERV 13 filters. Electrical service is 480 V, three-phase. - Services: Remove the existing unit; install and connect the replacement to existing ductwork, gas, electrical, and temperature-control systems; integrate controls with the existing building automation system (BAS); and test and turn over the updated system. - Notable requirements: Preserve the existing roof warranty, replace the RTU breaker, verify site conditions, maintain operation during installation, and plan a low-downtime controls cutover. - Schedule: Work is anticipated in spring 2027, with completion by late spring. No option years or subscription term are identified.
Description
Ivy Tech Community College of Indiana is seeking bids for replacement of the rooftop unit (RTU1) at the Indiana Center for Life Sciences in Bloomington, Indiana. The existing unit is described as an aging 60-ton rooftop unit, and the work includes coordinating required work among trades. The College intends to award one contract to the lowest responsive and responsible bidder. Proposals are due December 11, 2026, and bids must remain firm for 120 days from the opening date.