Opportunity
SBIR / STTR #DTR27BZ02-NV001
DTRA SBIR research topics for UAS, hazard sensing, blast modeling, and domestic materials production
Buyer
Defense Threat Reduction Agency (DTRA)
Posted
November 07, 2026
Respond By
January 06, 2027
Identifier
DTR27BZ02-NV001
NAICS
541715, 541713, 541330, 334511
DTRA is seeking small-business research proposals for six defense technology topics, including UAS-based precision aiming for render-safe operations in CBRN environments. - Government buyer: Defense Threat Reduction Agency (DTRA), Department of War (DoW), DTRA SBIR/STTR Program. - Topics sought: UAS-based EOD precision aiming in CBRN environments; remote UAS-based X-ray assessment of devices; adaptive sensor tasking and routing for subsurface hazard detection; validation of battlefield blast-injury models; domestic production of high-purity scintillator precursor materials; and scalable domestic growth of large-format pixelated CZT crystals. - Work sought: Phase I feasibility, design, analysis, and proof-of-principle research, with follow-on Phase II work potentially involving prototypes, integration, testing, validation, and scale-up. The broader DoW SBIR announcement also includes Direct-to-Phase-II opportunities, subject to topic-specific requirements. - Notable requirements: Remote operation in CBRN conditions, explainable edge AI, rigorous model validation, reproducible high-purity materials, and resilient domestic supply chains. - Funding and performance: Phase I is generally seven months for these DTRA topics, with a $250,000 base ceiling excluding TABA (TABA capped at $6,500). Phase II may run up to 24 months, with a $1,500,000 ceiling excluding TABA (TABA capped at $50,000). The broader announcement describes Phase I as generally 6–12 months and Phase II as generally 24 months. - OEMs and vendors: No commercial OEMs, vendors, products, part numbers, or purchase quantities are identified.
Description
This Defense Threat Reduction Agency SBIR topic seeks proposals for UAS-based precision aiming to render a device safe in CBRN environments. The topic is part of the DoW SBIR 2027 BAA, Release 2, and is listed as pre-release. Proposals are due December 18, 2026. DTRA instructions specify Phase I work with a seven-month duration and a base amount not exceeding $250,000, excluding TABA.