Opportunity
California eProcure #0000040890
CDCR statewide on-call asbestos, lead, and mold abatement services
Posted
November 06, 2026
Respond By
December 04, 2026
Identifier
0000040890
NAICS
562910, 562211, 562112
The California Department of Corrections and Rehabilitation is seeking on-call hazardous-material abatement and removal services across its statewide facilities. - Buyer: California Department of Corrections and Rehabilitation (CDCR), Division of Administrative Services, Office of Business Services, Contracts Management Branch, through the Correctional Construction Mentorship Program. - Scope: As-needed cleaning, containment, abatement, removal, transportation, and disposal of asbestos-containing materials (ACCM, RACM, PACM, ACM), lead-based paint and lead-containing paint/materials (LBP, LCP, LCM), and mold-contaminated materials (MCM). No products, part numbers, OEMs, or vendors are specified. - Locations and estimated funding: 22 institution/facility groups statewide. State estimates range from $100,000 to $5,000,000 per group and total approximately $29.4 million. These are estimates; work and quantities are not guaranteed. - Group estimates: Groups 1–5: ASP/PVSP $2.3M; CAL/CEN $250K; CCI $750K; CCWF/VSP $750K; CHCF $2M. Groups 6–10: CIM/CIW $2M; CMC $1.8M; CMF/SOL $5M; COR/SATF $1.8M; CTF/SVSP $3.5M. Groups 11–15: FCRP-SD $150K; FCRP-SFS $150K; FSP/SAC $3M; HDSP $100K; ISP $250K. Groups 16–22: KVSP/NKSP/WSP $750K; LAC $500K; MCSP $200K; PBSP $100K; RJD $150K; SCC $2M; SQRC $1.9M. - Contractor qualifications and response: Contractors must meet applicable licensing and certification requirements, including C-22 (or a B contractor using a qualified C-22 subcontractor), ASB, and HAZ requirements. Emergency requests require a four-hour response; ordinary requests require a response within two business days. Mold work must be demonstrated asbestos- and lead-free, or applicable asbestos and lead controls also apply. - Pricing and participation: Bidders may select one or more groups but must price every location and rate-sheet item in each selected group. Rates are to include labor, travel, equipment, materials, transportation, PPE, insurance, permits, licenses, certifications, and other required costs. CDCR identifies a 25% small-business participation requirement and encourages certified small and micro-business participation. - Performance term: An as-needed agreement of approximately three years; the provided materials do not identify option years.
Description
This master agreement seeks as-needed cleaning, removal, transportation, and disposal of asbestos-containing materials, lead-based paint and materials, and mold-contaminated materials. Services are for the California Department of Corrections and Rehabilitation’s Correctional Construction Mentorship Program at participating institutions and facilities. Rates are to include labor and related expenses, equipment, materials, transportation, PPE, insurance, licenses, certifications, permits, and bonds. Required contractor credentials include a C-22 Asbestos Abatement Contractor license and HAZ Hazardous Substance Removal Certification.