Opportunity
Nevada Ionwave #608087-26 Addendum 5
Clark County roadway, waterline, lighting, and streetscape improvements
Posted
October 14, 2026
Respond By
November 17, 2026
Identifier
608087-26 Addendum 5
NAICS
237310, 238210, 237130
Clark County is seeking bids for coordinated roadway, utility, lighting, and streetscape improvements on Las Vegas Boulevard and Flamingo Road. - Government buyer: Clark County, Nevada; CC Purchasing and Contracts. Scott Basquiat-Jones is named in the bid invitation. - Project locations: Approximately one mile of Las Vegas Boulevard between Flamingo Road and Spring Mountain Road, and approximately three-quarters of a mile of Flamingo Road between I-15 and Koval Lane. - Las Vegas Boulevard work: Milling and resurfacing, sidewalks and ADA ramps, curb and gutter, median reconstruction, bus turnouts, landscaping and irrigation changes, storm sewer work, utility adjustments, traffic signals at six intersections, striping and signs, lighting, and power and communications connections for Smart poles. - Flamingo Road work: Pavement work, curb and sidewalk repairs to current ADA standards, signal modifications and detector loops, utility adjustments, storm drain installation, striping, signs, and LED street-light luminaires. - Waterline: Install a replacement waterline along the Las Vegas Boulevard project length for the Las Vegas Valley Water District. Isolation valves are identified at four locations; omission requires prior Engineer and Owner approval. - Named products and specifications: Type 5 Smart poles are required; alternate manufacturers meeting Type 3 or Type 4 specifications are not accepted. The documents also reference Opticom Model 722 detectors and Evotherm as an approved compaction aid for F1 pavement courses. No OEM is identified for these products. - Additional quantities: 276 EA of median landscape uplighting removal and 690 SY of 6-inch concrete pavement. - Notable construction requirements: Work must be phased around annual Formula 1 restrictions; F1-track paving has a required seasonal start and remaining track work must be completed before the following race. The aggregate base must be from the Clark County Qualified Materials List and have passing test results. - Other named organizations: Kimley-Horn is identified as the Engineer; the Las Vegas Valley Water District is the waterline Owner. Neither is identified as a product vendor.
Description
Clark County is soliciting bids for roadway improvements on Las Vegas Boulevard from Flamingo Road to Spring Mountain Road, approximately one mile, and on Flamingo Road from I-15 to Koval Lane, approximately three-quarters of a mile. Work includes pavement, curb and sidewalk, median, street lighting, landscaping and irrigation, traffic signal, utility, storm sewer, striping and signing improvements. The Las Vegas Boulevard work also includes installation of a new waterline to replace an existing Las Vegas Valley Water District waterline. The source identifies the procurement as a CC Invitation for Bid and gives a bid deadline of November 17, 2026, at 2:15 PM PT.