Opportunity

Santa Cruz Opengov #PW-0332

Santa Cruz unsignalized crossing improvements: RRFBs, accessible pedestrian features, signs, and roadway work

Posted

October 21, 2026

Respond By

November 05, 2026

Identifier

PW-0332

NAICS

237310

The City of Santa Cruz Public Works Department is seeking construction improvements at five unsignalized pedestrian crossings as part of the HSIP Cycle 11 and 12 project. - Buyer and status: City of Santa Cruz, Public Works Department. The notice provides revised bid results and tabulations; it does not announce an award. The project covers Laurel Street/Blackburn Street, Broadway/Pennsylvania Avenue, Seabright Avenue/Logan Street, High Street/Cardiff Place, and Soquel Avenue/Poplar Avenue. - Named OEMs: Carmanah — R920-E solar assembly specified for the RRFB system, or approved equal; Polara — iNX pedestrian push button specified, or approved equal. - Main work: Install pedestrian-activated rectangular rapid flashing beacons (RRFBs), push buttons and posts, signs, pull boxes, conduit and conductors; build curb ramps, curbs, gutters, sidewalks and traffic islands; install detectable warning surfaces; and perform related removals, utility adjustments, traffic control and pavement markings. - Key quantities: 21 RRFB light bars; 17 pedestrian push buttons; 5 pull boxes; 74 linear feet of conduit and conductors; 903 square feet of curb ramps; 1,279 square feet of sidewalks; and 267 square feet of detectable warning surfaces. The detailed schedule specifies 18 solar assemblies across the two cycles, while the plan summary lists 17; confirm the final quantity. Other plan and schedule quantities for posts also differ, as noted in the line items. - Notable requirements: Work must follow project plans, City and Caltrans standards, and applicable ADA and MUTCD requirements. The RRFB system has a five-year warranty and cast-in-place tactile tiles a five-year guarantee. - Performance: Begin within 10 days after the Notice to Proceed and complete within 50 working days. No specific OEM is named for other construction materials or traffic-marking products.

Description

The City of Santa Cruz Public Works Department is soliciting bids for the HSIP Cycle 11 and 12 unsignalized crossing improvement project. Work includes furnishing labor, materials, tools, equipment, and transportation to install concrete curbs, gutters, sidewalks, curb ramps, roadway signs, pedestrian-activated beacons, striping, and pavement markings. The work also includes other requirements specified in the project plans, City and State Standard Specifications, and Special Provisions. The solicitation specifies hard-copy submittals only.

View original listing