Opportunity

Utah Public Procurement Place U3P #CS27028

Weber State University Waterline Replacement, Phase 3

Posted

November 05, 2026

Respond By

December 22, 2026

Identifier

CS27028

NAICS

237110

Utah DFCM is seeking a construction contractor to replace water mains at Weber State University in Ogden. - Buyer and project - State of Utah, Executive Branch Agencies, through the Division of Facilities Construction and Management (DFCM); Weber State University (WSU), Ogden, Utah. - WSU Waterline Replacement, Phase 3; DFCM Project #20417810 and U3P Reference #CS27028. - Requested products — OEM: Niron - 12-inch culinary water main piping; quantity and replacement length not specified. - 10-inch secondary irrigation main piping; quantity and replacement length not specified. - Associated vaults, valves, fittings, and new or reconnected fire hydrants; quantities not specified. - Construction services - Replace the existing mains along 4100 South, tie into existing systems, and remove or abandon facilities where indicated. - Perform excavation, bedding, backfill and compaction, testing and disinfection, erosion control, traffic control, and restoration of pavement, curbs, landscaping, and pavement markings. - Coordinate utility shutdowns with WSU and applicable agencies, provide advance notice, and minimize traffic and access impacts. - Named companies - Niron is the specified piping brand/OEM. - Talisman Civil Engineering, LLC is identified as the project designer. - Notable requirements - Construction budget is estimated at $1.4 million. - Work is planned for summer 2027, with completion required within the scheduled construction period. - Prime bidders must be prequalified in the applicable discipline; first-tier subcontractor information and licensing details must be submitted as required by Utah law.

Description

The State of Utah Division of Facilities Construction and Management is seeking bids from Stage II prequalified mechanical and site civil contractors for construction at Weber State University. Work includes replacing culinary water and secondary irrigation mains along 4100 South, with associated vaults, valves, hydrant connections, utility tie-ins, demolition, testing, and surface restoration. Work is scheduled between May 3 and August 13, 2027, and attendance at the November 16, 2026 mandatory meeting is required for prime contractors. Bids must include a bid bond and be submitted and finalized through the U3P portal by December 22, 2026; the stated construction cost estimate is $1,400,000.

View original listing