Opportunity

Fort Worth Independent School District Ionwave #27-010 Addendum 3

FWISD North Side Pyramid Middle School Consolidation General Contractor

Posted

September 24, 2026

Respond By

November 11, 2026

Identifier

27-010 Addendum 3

NAICS

236220

Fort Worth Independent School District is seeking a general contractor to deliver the North Side Pyramid Middle School Consolidation project. - Buyer and project: Fort Worth Independent School District (FWISD), Purchasing; 2021 Capital Improvement Program, TEA #044, CSP #27-010. The owner’s representative is PROCEDEO Group, and the architect is Kline Hardin Architects. - General contracting scope: School construction and site work, including coordination of construction sequencing and temporary power to keep essential life-safety and building-protection systems operating during utility transitions. The stated construction cost limit is $76 million, including a 5% owner contingency. - Technology and equipment: Cisco 9300 switches for network data ports, with black patch cables, are to be supplied and installed by the contractor. The contractor also provides cable trays, security cabling, and cameras. The owner provides telephones and Layer 2 security, Layer 3 district WAN, and PoE public-address switches. - Three 65-inch non-interactive TVs: two for the cafeteria and one for reception. - Two 75-inch interactive TVs: one each for the Principal’s and SPED conference rooms. - Biometric time clocks are included in revised security plans; quantity is not specified. - Other specified work and materials: Replacement window blinds regardless of whether the window-replacement alternate is accepted; PAC-CLAD M-Panel behind parapets in area C; precast stair treads and risers; ornamental fencing and manually operated vehicle gates; delegated-design running track and retaining walls; and a 5-inch reinforced-concrete basketball court with acrylic surfacing. Gate (now Wells) and Coreslab are identified as acceptable precast stair manufacturers, with alternatives allowed. - Additional clarifications: Genetec and Axis are referenced in security-system questions, with details deferred to revised plans and specifications. No beam detectors are in scope; carbon monoxide detector locations are to be clarified in an addendum. - Performance timing: Notice to Proceed is anticipated in Q1 2027. The documents do not specify the construction duration or completion date.

Description

Fort Worth Independent School District is requesting competitive sealed proposals to select a general contractor for the North Side Pyramid Middle School Consolidation (TEA# 044). The work is part of the FWISD 2021 Capital Improvement Program. Solicitation documents are available through FWISDplanroom.com, and proposals must be submitted through the Fort Worth ISD Electronic Bid System. The proposal deadline is November 11, 2026, at 2:00 PM CT.

View original listing