Opportunity

Prince Edward Island #PEI-DTI-7259

Cabot Park bridge replacement, including structure, earthworks, and roadway work

Posted

November 04, 2026

Respond By

November 19, 2026

Identifier

PEI-DTI-7259

NAICS

237310

The Government of Prince Edward Island is seeking a contractor to replace the Cabot Park bridge on Route 105 in Malpeque. - Buyer: Government of Prince Edward Island, Department of Transportation and Infrastructure. - Scope: Remove the existing bridge and construct a replacement, including steel piles, concrete abutment work, timber stringers and decking, structural steel barrier components, riprap, gabion baskets, earthworks, and roadway and asphalt work. - Estimated quantities: Include 597.5 m of steel piles supplied and 476 m driven; 331.5 m of timber stringers; 125 m² of timber decking; 5,100 kg of miscellaneous metals; and 390 tonnes of asphalt seal. The full listed quantities appear in the line items below. - Notable requirements: Keep the watercourse flowing and unobstructed; maintain environmental controls; meet CSA S6-19 and applicable Department specifications. Concrete and other materials must meet the specified technical requirements. ACE XP Polymer Fibre is specified for asphalt seal, or an Engineer-approved equivalent; Flexterra or Firbramulch, or a Department-approved equivalent, are listed for hydroseeding. - Schedule and warranty: 70 working days across two phases (55 days and 15 days); the spring phase is limited to three weeks. A one-year warranty applies after substantial completion. - Named companies and brands: No bridge-construction OEM or supplier is identified. Joose Environmental is referenced as the preparer of borehole and geotechnical information, not as a supplier. ACE XP, Flexterra, and Firbramulch are named product brands.

Description

The solicitation seeks a contractor to supply the labour, equipment, and materials to replace the existing bridge structure on Route 105 in Malpeque. Work includes excavation, environmental controls, demolition and removal of the existing structure, installation of steel piles and a new timber structure, concrete work, barriers, rip rap and gabion baskets, and associated roadwork and asphalt paving. The work must include all ancillary tasks required to complete the installation to the Owner’s satisfaction. The stated contract duration is three months.

View original listing