The U.S. Coast Guard is seeking repairs and upgrades to nine floating Jet Docks at TRACEN Yorktown, Virginia. - Buyer and location: U.S. Coast Guard Facilities Engineering Division, Training Center Yorktown; Building 292. - OEM: Jet Dock Systems Inc. is identified in the attached scope as the sole-source manufacturer. No part numbers are provided. - Main work and quantities: Replace 18 damaged large module assemblies (MAs), 40 damaged or open-well small MAs, nine keel deflection systems, 27 structural support beams, and 18 pontoon guide beams. Replace pontoon straps and hardware, including 36-inch lifting eyes, and install cathodic protection on all 45 beams. - Other dock work: Replace powerhead valves and wiring on all nine docks; install 18 freshwater washdown hoses (40 feet each), nine MA-to-piling protection systems, and nine bunk tusk systems; rebuild all nine dock sterns with intermediate corrugation support; and replace approximately six damaged pontoons with the same size and kind or the closest available approximation. - Boat-specific upgrades: Add approximately 30 large and five small MAs to five docks assigned to 29-foot RB-S II boats. Install inner bunk systems on all nine docks and calibrate existing and replacement pontoons for 29-foot RB-S II boats (8,400 lb), 26-foot TANB boats (7,300 lb), and 26-foot CB-OTH-V boats (7,470 lb). - Execution requirements: Field-verify dimensions, coordinate work to avoid disrupting training, and follow dock assignments in drawing 2-29202-1. Work cannot begin until the schedule, safety plan, and material submittals are approved. - Timing: Commence within 30 calendar days after award and complete within 150 days after award; the exact start date is coordinated with the COR. - Opportunity type: Solicitation for dock repair and upgrades; the notice does not provide a stated contract value.

Description

Contractor to provide all labor, materials, and equipment necessary to repair the floating Jet Docks, BLDG 292. Work consists of:

Remove and replace 18 damaged large Module Assemblies (MAs). Remove and replace 40 open well style or damaged small MAs and replace with standard small MAs. Remove and replace keel deflection system (KDS) on all nine docks. Remove and replace all pontoon straps and hardware (36” lifting eyes) for all nine docks. Remove and replace all 27 structural support beams and all 18 pontoon guide beams across all nine docks – 45 total. Install new cathodic protection system on all beams – 45 total. Remove valves and wiring on powerhead for all nine docks and replace with standard valves and wires. Install two freshwater washdown hoses, 40 ft length, per dock – 18 total. Install protection system between MAs and piling – one per dock, nine total. Install bunk tusk system, one per dock, nine total. Rebuild the dock stern to include intermediate corrugation support on all nine docks. Remove and replace any damaged pontoons with the same size and kind. If no longer in production, replace with closest approximation – approximately 6 pontoons. Install additional MAs on docks that are assigned the 29 ft RB-S II boats – 5 docks total, approximately 30 large MAs, 5 small MAs.

Install new inner bunk systems on all docks to accommodate the boats described below: 29 ft RB-S II boats (8,400 lbs), 26 ft TANB boats (7,300 lbs), and 26 ft CB-OTH-V boats (7,470 lbs). Calibrate existing and replacement pontoons for the boats described above. For a layout of dock assignments, refer to the included drawing 2-29202-1.