Opportunity

E-Rate #270003476

Armijo High School structured cabling replacement and expansion

Posted

November 04, 2026

Respond By

December 02, 2026

Identifier

270003476

NAICS

238210

Fairfield-Suisun Unified School District is seeking a structured cabling replacement and expansion at Armijo High School. - Buyer: Fairfield-Suisun Unified School District; Purchasing, Warehouse, and Contracts Department. - Scope: Approximately 32,510 feet of internal-connections cabling, including fiber-optic and copper Ethernet infrastructure, plus extensive Cat 6A drops throughout classrooms, offices, gym areas, and relocatable rooms. - Major quantities: Cat 6A drops by campus area (quantities listed individually below); one 320-foot estimated, 6-strand LC-LC 50/125 OM4 fiber run; and one new REBOX wall cabinet for Room T3. - Named OEMs and manufacturers: Panduit (CBX2IW-AY surface-mount box), Oberon (WAP mounts and retrofit trim), Ruckus (R730 or R770 AP compatibility), REBOX (cabinet), and Fluke (example test equipment). No exclusive manufacturer preference is specified; equivalent products are allowed where stated. - Key requirements: Cat 6A cable must be 23 AWG solid copper CMP and support 802.3bt PoE. The contractor must install, test, and certify all Cat 6A links to ANSI/TIA-568.2-D Category 6A Permanent Link standards, provide test results and as-built documentation, and provide at least a 25-year manufacturer cabling/component warranty and a two-year workmanship warranty. - Funding and performance: Work is contingent on E-Rate funding and District approval. Performance begins after the funding commitment and project start conditions are met; the stated completion milestone is in the solicitation. No annual subscription is indicated. - Estimated value: Approximately $150,000–$350,000; this is an analytical estimate, not a stated solicitation amount.

Description

The District seeks cabling infrastructure at Armijo High School, including approximately 32,510 feet of cabling. The attached RFP provides the complete project details, site maps, and cabling specifications; the project is also described as fiber optics and copper Ethernet cable infrastructure replacement. A mandatory pre-bid conference and site walk is scheduled for November 12, 2026, at 9:00 a.m., and bidders must attend the entire event on time to remain eligible. The source lists December 2, 2026, as the bid response deadline, while the attached RFP states that sealed bids are due December 17, 2026, by 2:00 p.m.

View original listing