Opportunity
Edmond Ionwave #RFP27-012
Contractor prequalification for Edmond’s 33rd Street Water Line, Phase 2
Posted
November 04, 2026
Respond By
December 02, 2026
Identifier
RFP27-012
NAICS
237110, 237990
The City of Edmond is seeking qualified contractors for a major water-main and street-improvement project in Edmond, Oklahoma. - Buyer and project team - City of Edmond Purchasing Department; project owner: Edmond Public Works Authority. - Freese and Nichols, Inc. is identified as the project engineer. - Project scope - Construct approximately 9,060 LF of 24-inch ductile-iron transmission main, 5,786 LF of 8- and 12-inch PVC distribution mains, and related fittings and appurtenances. - Install 235 LF of steel casing using trenchless methods; provide hydrants, valves, and water-service connections; abandon existing piping and reconnect services. - Perform related traffic-signal, sidewalk, pavement, drainage, landscaping, fencing, and site-restoration work. - Notable requirements - Prequalification is required; applicants must show relevant experience, satisfactory performance, and adequate bonding capacity. Each joint-venture member must meet the stated experience and performance requirements. - Plans emphasize maintaining water service and property access, utility coordination, phased traffic control, and coordination for school connections and park-service relocation. Plans are marked “Not for Construction.” - Construction cost is estimated at $11–16 million. The construction schedule is anticipated to run about 16 months from tentative notice to proceed through final acceptance; no option years or annual subscription are specified. - Companies and products - No pipe, equipment, or material OEMs are named. Freese and Nichols, Inc. is the named project engineer, not an identified product manufacturer. - The plan quantities and associated construction services are itemized below.
Description
The City of Edmond is seeking contractor qualifications to prequalify bidders for construction of the 33rd Street Water Line, Phase 2 project, owned by the Edmond Public Works Authority. The work generally includes approximately 9,000 LF of 24-inch transmission piping, approximately 5,800 LF of 8- to 12-inch distribution piping, trenchless tunneling under E. 33rd Street, hydrant improvements, abandonment of existing piping, and service reconnections. Prequalification considers similar experience, performance history, and bonding capacity; only prequalified contractors may bid when the project is solicited later. Responses are due online by December 2, 2026, at 2:00 PM CT.