Opportunity

Texas DIR/ESBD #TAMUS-RFQ-02-3487

A/E Services for Texas A&M Domestic Water Well #6 Upgrade

Posted

November 03, 2026

Respond By

December 01, 2026

Identifier

TAMUS-RFQ-02-3487

NAICS

541330, 541310

Texas A&M is seeking an Architect/Engineer firm for a major domestic water well replacement and infrastructure upgrade in Bryan, Texas. - Government buyer: The Texas A&M University System, Office of Facilities Planning & Construction, on behalf of the Board of Regents and Texas A&M University. - Opportunity: A/E qualifications for the Domestic Water Well #6 Upgrade; this is a professional-services selection, not an equipment bid. - Project scope: Replace the existing well with a new 24-inch Simsboro Aquifer well and install a 1,000-HP, 4,160-V vertical turbine pump. Quantities beyond the stated single replacement well and pump are not specified. - Other equipment and infrastructure: Medium-voltage transformation equipment, switchgear, protective relays, conduit and conductors; an emergency generator with load-bank connection; a reinforced pump pad; a cooling tower; and SCADA and communications integration. Civil and site work is also required. - Existing well: After commissioning, the existing well must be plugged and abandoned or reclassified, subject to applicable requirements. - Notable requirements: The new well must meet Brazos Valley Groundwater Conservation District (BVGCD), Texas Commission on Environmental Quality (TCEQ), and Texas Department of Licensing and Regulation (TDLR) requirements. - Planning amount: $20,640,000 total, including $17,389,893 available for the construction contract. - OEMs and vendors: No equipment OEMs, manufacturers, or commercial vendors are named in the provided materials.

Description

The Texas A&M University System is requesting qualifications from Architect/Engineer firms for the Domestic Water Well #6 Upgrade project at Texas A&M University in Bryan, Texas. The project includes a new 24-inch Simsboro replacement well, a 1,000-HP vertical turbine pump, electrical upgrades, an emergency generator, and related site, cooling tower, and SCADA work. The existing Well #6 will be plugged and abandoned or reclassified after commissioning, subject to BVGCD requirements. The planning amount is $20,640,000, and qualifications must be submitted through e-Builder by December 1, 2026, at 2:00 p.m. CST.

View original listing